BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 6, 2022 at 7:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Bedford charter Township, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

1.48 mi of hot mix asphalt cold milling and resurfacing and installation of recessed wet reflective centerline and edgeline pavement markings on O Drive N (Morgan Road) from 6 Mile Road (North Avenue) to M-66, Calhoun County. This is a Local Agency project. Control Sec Job No Federal No HSIP 13000 214631A 23A0060 STUL 13000 207393A 23A0054 CRSM 13000 207469A 23AA0057 Net classification required for this project is 1088 Cb In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of L. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. MI DOT - 2212 065 -Hot Mix Asphalt Cold Milling and Resurfacing and Installation of Recessed Wet Reflective Centerline and Edgeline Pavement Markings on O Drive N (Morgan Road) MBE (7.2%), WBE (6.9%), DBE (3%) Start date- June 14, 2023 The entire project must be completed by the final completion date of May 17, 2024.

Award

Roads / Highways

$1,117,278.00

Public - State/Provincial

Paving, Site Work

32

7

6

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
116
Bidding Soon
1,673
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2022

June 14, 2023

Project location map

Morgan Rd E, Bedford charter Township, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.