Published March 22, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a warehouse / distribution facility in Doylestown, Pennsylvania. Working plans call for the renovation of a warehouse / distribution facility.

**As of March 22, 2023. Bid received has been rejected. No new bid date set yet.** This project will be constructed under a multi-prime contract: Contract 1: Mechanical Contractor Contract 2: Electrical Contractor Please note, bidders proposing to submit a bid on this project are required to be pre-qualified in accordance with Ordinance 162, by submitting a Contractor Responsibility Certification Form at least 14 calendar days prior to the specified bid submission date. Ordinance 162 and the Contractor Responsibility Certification Form are included in the bid package. Clarification Deadline Question Deadline 02/06/2023 at 12:00 PM ET Questions must be submitted through the PennBid website A security deposit (cash, a certified check or cashier's check-- drawn on a bank authorized to do business in the Commonwealth of Pennsylvania, or a properly executed bid bond-- if a corporation, signed by a properly authorized representative of the providing company with the corporate seal; if unincorporated, signed by a properly authorized representative of the providing company with a witness signature as well as a signature and seal by a properly authorized representative of the providing company with a witness signature as well as a signature and seal by a properly authorized officer of the bonding company with proof of the authority to sign on behalf of the bidder and the bonding company accompanying the bond) in the amount of 5% of the total bid. Said security must be made payable to the County of Bucks. Security deposit of cash or certified check must be deposited with the County Controller at least one-quarter hour before the time set for opening of bids. A Bid Bond security deposit must be uploaded with the bid response. The security deposit shall guarantee that the bidder will fully and faithfully comply with all of the terms of the bid, and give bond in accordance therewith. PERFORMANCE BOND with surety in the amount of 100% of the contract amount. The Performance Bond shall be conditioned upon the faithful performance of the contract in accordance with the plans, specifications and conditions of the contract. LABOR AND MATERIAL (PAYMENT) BOND with surety in the amount of 100% of the contract amount. The Labor and Material Bond shall be conditioned upon the prompt payment of all material furnished and/or labor supplied in the prosecution of the work. Also required is a MAINTENANCE BOND with surety in the amount of 10% of the contract amount. The Maintenance Bond shall be surety against defective or inferior materials or workmanship which may develop during a period of one year from date of total completion and acceptance of all work performed under the contract.

Final Planning

Warehouse / Distribution

$192,999.00

Public - County

Renovation

9

11

6

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Specialty Placed Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Steep Slope Roofing, Roof Tiles
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Flooring, Wood Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, Facility Fuel Systems, Facility Fuel Piping, Facility Natural-Gas Piping, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Transfer Switches, Manual Transfer Switches
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors

Find More Local Projects

Within 75 Miles of This Project
519
Active Projects
274
Bidding Soon
4,499
All Active Projects
2,174
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2023

September 25, 2023

img_map_placeholder

1265 Almshouse Rd, Doylestown, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Rebid Voting Machine Warehouse HVAC and Electrical Upgrades

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.