Site work, paving and new construction of an educational facility in Stonecrest, Georgia. Working plans call for the construction of a 80,000-square-foot, one-story above grade educational facility; and for site work for a educational facility.
As of October 3, 2024, this project has been on hold since spring 2024. The construction manager at risk and architect have been identified. A firm construction timeline has not been established. *The previous solicitation is listed below for reference. The Georgia State Financing and Investment Commission (GSFIC), as “Owner”, on behalf the Technical College System of the State of Georgia and Quick Start (“Using Agency”) is seeking Statements of Qualifications from firms interested in providing design professional services for a project known as Project No. TCSG-397 Quick Start EV Training Center -Newton County. Maximum building capacity is currently projected to be 500, and DP (Design Professionals) will comply with the Georgia State Properties Commission’s guidelines regarding assignment of spaces. Assuming a general estimate of the building size to range between 80-100,000-sq.ft., the Training Center will include classrooms, technical labs, high-capacity spaces suitable to contain manufacturing-scale training simulations incorporating robotics, mechatronics, welding, motors, and other advanced manufacturing technologies. There will be a critical demand for hardwired and wireless networking capabilities, multiple segmented and secured server spaces, and A/V installations. Designated training spaces will also need appropriate utilities, air-handling and safety/emergency response capabilities related to high-voltage components, “thermal runaways” and potential toxic chemical release. The Center will require robust safety, security, fire suppression and emergency response systems. Candidate teams will demonstrate competency and experience in sustainable, healthy-building design strategies, Maximum building capacity is currently projected to be 500, and DP (Design Professionals) will comply with the Georgia State Properties Commission’s guidelines regarding assignment of spaces. Assuming a general estimate of the building size to range between 80-100,000-sq.ft., the Training Center will include classrooms, technical labs, high-capacity spaces suitable to contain manufacturing-scale training simulations incorporating robotics, mechatronics, welding, motors, and other advanced manufacturing technologies. There will be a critical demand for hardwired and wireless networking capabilities, multiple segmented and secured server spaces, and A/V installations. Designated training spaces will also need appropriate utilities, air-handling and safety/emergency response capabilities related to high-voltage components, “thermal runaways” and potential toxic chemical release. The Center will require robust safety, security, fire suppression and emergency response systems. Candidate teams will demonstrate competency and experience in sustainable, healthy-building design strategies, such as on-site renewable energy generation; all-electric systems; use of mass-timber systems in structural, enclosure and acoustic design; and recommendations for carbon-accounting solutions such as assessment of embodied carbon in the life cycle of selected materials, and monitoring of operational release of GHGs, with the ultimate goal being net-zero carbon emissions. One aspect unique to this project bidders should factor into their proposals is that a sizable portion of the traditional Conceptual Design phase will be accelerated due to the fact that the Company will provide an existing set of conceptual recommendations to serve as a starting point for facility programming, allowing the team to rapidly move into the Schematic Design phase with an aggressive goal of building completion taking place in the fourth quarter of 2024. The DP will also provide recommendations as appropriate to further accelerate the design and construction processes without compromising the integrity and functionality of the building project. Considering the current challenges regarding the availability of certain materials and equipment, the DP will provide ongoing due diligence to inform the OAC team of fluctuations in costs and availability of considered materials, fixtures, devices, etc. to facilitate decision-making that balances choice preferences with controlled costs and tight deadlines. The Design Professional’s services are anticipated to commence early in the first quarter of 2023 with 75% construction documents anticipated for completion by the end of the third quarter of 2023. It is envisioned that Construction would start with the issuance of an early component package thereafter, with material completion being reached by the end of the fourth quarter of 2024.
Pre-Construction/Negotiated
Educational
$43,000,000.00
Public - State/Provincial
New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2025
I-20 & US-278, Stonecrest, GA
Related To This Project
Stonecrest, GA
Bid Date: Dec 16 2022
Stonecrest, GA
--
Stonecrest, GA
Bid Date: Jan 17 2023
Stonecrest, GA
--
Stonecrest, GA
Bid Date: Jan 26 2023
Stonecrest, GA
--
Stonecrest, GA
--
Stonecrest, GA
Bid Date: Jun 16 2022
Stonecrest, GA
--
Alpharetta, GA
Bid Date: Nov 16 2022
Atlanta, GA
Bid Date: Nov 30 2022
Atlanta, GA
Bid Date: Nov 15 2022
Sharpsburg, GA
Bid Date: Oct 11 2022
Augusta, GA
Bid Date: Dec 08 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.