BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Leland, North Carolina. Completed plans call for the renovation of a educational facility.

The contractors are responsible for all items required to complete the scope of services; those items being included in the scope of services even if not listed below. The Contractors workmanship shall be equal to or exceed the workmanship of reputable Contractors performing similar work in the Wilmington Metropolitan Service Area. Contractor shall perform the following scope of work in compliance with all federal, state, and local codes and in accordance with any plans, specifications and engineered drawings, design, or criteria. The general scope involves demolition and renovation of specified Locker Rooms. Work to include but not limited to installation of new quarry tile flooring and base, plumbing fixture removal and replacement, electrical fixture replacement, paint, stain, drywall repair, toilet partition removal and replacement, HVAC grill replacement, CMU replacement, metal stud framing, install hollow metal frames, wood doors, and hardware and all incidental work relating to the project in order to provide complete and fully functional operating restroom facilities. Contractor is responsible for scope and to verify all quantities, dimensions, and sizes. Brunswick County Schools is informally requesting bids for the performance of the following work or services. Bids shall be binding for 30 days. Bidders must hold a current North Carolina General Contractors License. The Contractor shall begin the work upon receipt of the Purchase Order, and expeditiously, with adequate forces, complete the work within the specified calendar days. The required milestone dates, and completion date are included in Exhibit 1. The contractor shall coordinate all work with Operations personnel to ensure minimal disruption to school activities. Should the Contractor fail to substantially complete the Work on or before the date stipulated for Substantial Completion, or such later date as may result from extension of time granted by Owner, he shall pay the Owner, as liquidated damages, the sum of Two Hundred and Fifty Dollars ($250.00) for each consecutive calendar day that terms of the contract remain unfulfilled beyond the date allowed by the Contract, which sum is agreed upon as a reasonable and proper measure of damages which the Owner will sustain per day by failure of the Contractor to complete Work within time as stipulated; it being recognized by the Owner and the Contractor that the injury to the Owner which could result from a failure of the Contractor to complete on schedule is uncertain and cannot be computed exactly. In no way shall costs for liquidated damages be construed as a penalty on the Contractor. Site Visit Authorization will only be permitted after school hours for students. Please confirm by emailing David Barbour at dbarbour@bcswan.net. Any contract over $300,000.00 must have a performance and payment bond. Any contract over $300,000.00 and is subject to MWBE General Statutes Board approval: February 7, 2023 - Notice to Proceed: February 8, 2023 - Anticipated Project Start Date: June 2, 2023 - Project Completion Date: August 18, 2023

Award

Educational

$181,411.00

Public - County

Renovation

70

7

4

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
38
Bidding Soon
424
All Active Projects
189
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2022

February 8, 2023

img_map_placeholder

114 Scorpion Dr NE, Leland, NC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.