Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 7, 2025 at 7:00 PM

Updated November 8, 2025

Site work and paving for a mixed-use development in Oberlin, Ohio. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of November 7, 2025, an engineer has been selected and 50%-90% design is in progress. A firm timeline for bidding and construction has not been determined. *The closed solicitation has been included below for reference: To improve pedestrian and cyclist safety and to expand the City's active transportation network, the City of Oberlin intends to develop improvements along the State Route 58 South corridor from Hamilton St., approximately one mile south to US 20, see attached map. The Public Works Department is seeking professional planning, surveying and engineering services to: o Develop a suitable understanding of current zoning and existing/planned land uses in the project area. o Evaluate the existing built environment along and adjacent to the project corridor including but not limited to SR58, existing sidewalks and driveways, underground utilities, drainage ways and overhead utilities. o Stay apprised of and evaluate potential effects of any developments under consideration in this corridor that may impact the alternatives analysis and/or design. o Review existing relevant traffic count and accident history data. Perform traffic and pedestrian/cyclist counts o Assess jurisdictional, right-of-way and related regulatory issues with the City of Oberlin, ODOT, New Russia Township and Pittsfield Township. o Review potential public and/or private grant/loan opportunities that may be available to subsidize the cost of the proposed improvements. o Develop alternatives for consideration to improve access and safety for pedestrians and cyclists, including advantages/disadvantages of each. Alternatives analysis must include consideration for safe access to both sides of the SR58 corridor as well as future access west along US20 and south across US20 on both sides of SR58. o Prepare preliminary budget estimates and probable schedule for each of the alternatives. o Develop and conduct public outreach. o Present alternatives to stakeholders and decision-makers in adjoining jurisdictions. o Present alternatives to Oberlin City Council for review and discussion. o Prepare draft and final reports. The method of Contractor Selection has not been Determined at this time

Design

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
343
Active Projects
146
Bidding Soon
2,577
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2026

Project location map

OH-58, Oberlin, OH


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed