BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 15, 2022 at 7:00 PM

Updated January 25, 2024

Site work for a water / sewer project in Payette, Idaho. Completed plans call for site work for a water / sewer project.

Drill a test well to a depth of approximately 350 feet using sonic methods and provide continuous soil samples for testing. Based on test well, drill and complete a 12.75-inch minimum diameter production well to a depth of approximately 350 feet. Also included are all fittings, appurtenances, and surface restoration as specified in the plans and contract documents. No Bids Received. No Prebid meeting. This project has an expected duration of 100 days. Site Directions: Within the NE quarter of Section 34, Township 9 N, Range 5 West, Boise Meridian. (Near N 16th Street, behind Payette City Fire Dept)

Post-Bid

Water / Sewer

$250,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
36
Bidding Soon
330
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2022

January 16, 2023

Project location map

N 16th St, Payette, ID


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.