BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Montgomery, West Virginia. Conceptual plans call for site work for a water / sewer project.

The services of a consulting engineer to address projects as listed in their 2019 Long Term Control Plan, as well as other wastewater projects the City may undertake. The consultant will be required to (1) prepare preliminary engineering report(s), (2) design and prepare construction drawings, bid specifications and bid documents, (3) evaluate bids received and make recommendation of award, (4) monitor and inspect construction activities to insure compliance with plans and specifications, (5) review and approve contractors pay estimates and (6) any other services needed by the City for the implementation of the project(s). The selected firm shall be retained throughout all phases of the project(s). All consultants interested in being considered must submit a proposal detailing qualifications, technical expertise, management and staffing capabilities and related prior experience. The purpose of the competitive process is to objectively select the consultant who will provide the highest quality of service at a realistic fee. Accordingly, technical qualifications and experience will be weighed heavily For questions or additional information, please contact Dwayne Isaacs at 304-442-5181 It is the responsibility of the respondent to ensure the receipt of the proposal by the date specified. Attention is directed to the fact that the project may be undertaken with a combination of State and ederal funds and all work must be performed in accordance with all applicable laws, rules and regulations. The selected firm will be required to comply with the Uniform Relocation Act, Title VI of the Civil Rights Acts of 1964, President Executive Order No. 11246, Section 109 of the Housing and Urban Development Act of 1974, Section 3 of the House and Urban Development Act of 1968, Conflict of Interest Statement and Access to Records provisions. The selected firm must also fully comply with the Minority omen-Owned Business Enterprise and Affirmative Action requirements. If a portion of the contract is subcontracted, then positive effort must be made to subcontract to Minority omen-Owned Businesses. This shall be done in compliance with the six (6) affirmative steps as outlined in 40 CFR 33.240. The project sponsor will afford full opportunity to women-owned and minority business enterprises that submit a show of interest in response to this request and will not discriminate against any interested firm or individual on the grounds of race, creed, color, sex, age, handicap or national origin in the award of this contract This contract will be awarded to the responsible offer or whose proposal is within the competitive range and determined to be the most advantageous to the Project Sponsor, price and other factors considered The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$700,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
23
Bidding Soon
361
All Active Projects
163
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2023

img_map_placeholder

Multiple Locations, Montgomery, WV


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.