BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and paving for a mixed-use development in Erie, Colorado. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the demolition of a water / sewer project; and water / sewer project.

As indicated in the construction plans, work includes conversion of two existing unused lagoons into a stormwater quality wetland pond, located at 1000 Briggs Street, west of the Reliance Dog Park. Work also includes the excavation, transportation and disposal of Biosolids material, locating existing utilities, erosion control, excavation and backfill, installation of a diversion manhole and inlet pipe, construction of a wetlands channel including revegetation, outlet structure and outfall pipe to Coal Creek, asphalt parking lot with concrete sidewalk connecting to Briggs Street, trails and boardwalks, shade structures, conduit for future Electric Vehicle (EV) charging stand, planting of trees, shrubs & irrigation, and site restoration. This project also includes irrigation pipes, emitters and controller for the vegetation along with a new tap onto the Town of Erie Re-use Water Line and a meter and meter pit. In addition, this project includes demolition of the Erie South Water Reclamation Facility (SWRF). The SWRF demolition project includes, demolition of the combined aeration and aerobic digester basins, two primary clarifiers with its covers and support columns, and a splitter box. Demolition includes removing the concrete structures to 3' below grade and filling the structures with clean fill. Demolition within the structures includes removal of equipment including supports, valves, piping, and ancillary devices. The recycling facility and associated structures will remain and should be protected. All Electrical conduits, panels, and wiring to be pulled, terminated, and capped by a qualified electrician. Irrigation onsite and existing trees to be protected and irrigation to be expanded into the areas filled. Final grading and seeding of the site after demolition shall be the responsibility of the Contractor. Question Acceptance Deadline All questions related to this bid should be submitted through the RMEPS website 12/14/2022 9:00 AM EST Questions are submitted online Yes Bonding Requirements Buyer Requires E-Bonding - Bid Bond 5 % Job Location 1000 Briggs Street, Erie, CO 80516

Post-Bid

Water / Sewer

$200,000.00

Public - City

Demolition, Paving, Site Work

162

28

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
36
Bidding Soon
931
All Active Projects
394
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2022

January 19, 2023

img_map_placeholder

1000 Briggs St, Erie, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.