BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Rouses Point, New York. Completed plans call for the demolition of a municipal facility; for the construction of a 10,000-square-foot municipal facility; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; transportation facility; water / sewer project; and municipal facility.

THIS IS A PRE-SOLICITATION NOTICE ONLY. This is not a request for proposal. Introduction The U.S. General Services Administration (GSA), Public Buildings Service, Northeast and Caribbean Region, is seeking a qualified contractor to provide full wetland mitigation services in conformance with the regulatory requirements of the U.S. Army Corps of Engineers (USACE) contained in 33 CFR Chapter II Part 332 -Compensatory Mitigation for Losses of Aquatic Resources. A new Land Port of Entry (LPOE) is planned to be constructed at the United States/Canada border along New York State Route 11 in Rouses Point, New York approximately 1/2 mile North of the existing LPOE. The new facility will replace the existing LPOE which was constructed in 1932. The new LPOE will increase operational efficiency, enhance commercial and non-commercial vehicle and Amtrak passenger experience, and improve CBP officer safety. Approximately 4.8 acres of regulated wetland will be disturbed (by the construction of the new LPOE) with an estimated mitigation acreage requirement of 8 acres. Scope Of Work This section details the technical requirements and constraints for which the Contractor is responsible. The Contractor shall perform all services described in this Statement of Work. The Contractor shall provide design and construction wetland mitigation services in conformance with the regulatory requirements of the U.S. Army Corps of Engineers (USACE) contained in 33 CFR Chapter II Part 332 - Compensatory Mitigation for Losses of Aquatic Resources. When considering options for successfully providing the required compensatory mitigation plan the contractor shall consider the type and location options in the order presented below. In general, the required compensatory mitigation should be located within the same watershed as the impacted site and should be located where it is most likely to successfully replace lost functions and services, considering such watershed scale features as aquatic habitat diversity, habitat connectivity, relationships to hydrologic sources (including the availability of water rights), trends in land use, ecological benefits, and compatibility with adjacent land uses. Procure, own and maintain land within the Richelieu Watershed (within New York State). Develop a wetland mitigation work plan in compliance with regulatory requirements. Prepare and submit - An operations and maintenance plan, long term management plan, adaptive management, financial assurances and application for CWA Section 404 and 401 application. Construct new wetlands in accordance with the approved wetland mitigation plan and/or provide other compensatory wetland mitigation measures intended to fulfill GSA's permittee responsible wetland mitigation requirements. Provide ongoing monitoring of wetlands per USACE regulations (332.6 Monitoring), which includes but is not limited to: construction annual inspections, maintenance and reporting per regulatory requirements to identify any conditions that threaten the proper function and development of the newly constructed wetland. Corrective measures shall be implemented to any deficiencies in vegetative cover, berm integrity or sit hydrology. Project Period of Performance and Magnitude: This project shall be performed by an experienced contractor that has performed similar work. The estimated period of performance is 365 calendar days. The magnitude of construction for this project is between $500,000 and $1,000,000. Contract Information and Issuance This requirement will be issued FULL AND OPEN COMPETITION. The applicable North American Industry Classification System (NAICS) code is 237990. The procurement method that will be implemented for this project will be in accordance with FAR Part 15.1 - Source Selection Processes and Techniques. This project is a competitive acquisition utilizing the Trade-Off process approach under the Best Value Continuum (FAR 15.101). This process permits tradeoffs among cost or price and technical factors, and allows the Government to accept other than the lowest priced proposal. For this procurement, the technical evaluation factors when combined will be approximately equal to cost or price. The contract type will be a Firm-Fixed-Price contract. GSA anticipates issuing the solicitation on or about June 17, 2023, with receipt of proposals at a minimum of thirty (30) calendar days later. All information, amendments and questions concerning this solicitation will be electronically posted at the System for Award Management (SAM) via https://www.sam.gov. No telephone requests will be accepted, and no paper copies will be mailed to prospective offerors. There will be no Pre-Proposal conference or site walk-through. All contractors must be registered in the SAM (System for Award Management) at https://www.sam.gov prior to contract award. Therefore, prospective offerors are encouraged to register prior to the submission of proposals. The guidelines for registration in SAM are also available at: https://www.fsd.gov/fsd-gov/learning-center-system.dosysparm_system=SAM INTERESTED PARTIES ARE STRONGLY ENCOURAGED TO REGISTER TO THIS NOTICE TO RECEIVE NOTIFICATION OF ACTIONS INCLUDING POSTING OF THE SOLICITATION. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Municipal

$1,000,000.00

Public - Federal

Demolition, LEED Certification, New Construction, Paving, Site Work

3

9

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
232
Active Projects
105
Bidding Soon
1,670
All Active Projects
662
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2023

August 1, 2023

img_map_placeholder

US-11, Rouses Point, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.