BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Colma, California. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Install traffic signal on Serramonte Blvd at the Serra Center entrance (Target). The project will be partially funded by a development impact fee ($26,000). Estimated project cost of $500,000 includes for the signalization of the intersection, the road realignment work at Serramonte Boulevard and Collins Avenue and removing the existing slip lane, restriping of Serramonte Boulevard to simulate the proposed lane reduction on Serramonte Boulevard, plus design and project management costs associated with the project. Capital | Streets, Sidewalks, & Bikeways 138 The elimination of the slip lane will provide a safer approach for pedestrians and bicyclists as vehicles enter Collins Avenue. The removal of the slip lane will provide a landscape area for wayward signage, gateway signage and landscaping while entering into the Serramonte Auto Row District. Another aspect of this project is to install temporary street stripping to simulate how the lane reduction on Serramonte Blvd. will perform and if the lane reduction is feasible. The restriping of the roadway will simulate the proposed lane reduction and will take two lanes of travel in each direction and reconfigure it to one lane of travel in each direction with a turn lane in the middle of the roadway. The purpose of the middle lane will provide vehicles to enter a safe area to make left hand turns into the various car dealerships and retail outlets. Likewise, vehicles exiting the various businesses along Serramonte will be able to make safe left hand turns onto the roadway and be able to enter the middle lane before merging into the oncoming traffic lane. The signalization of the Serramonte/Serra Center intersection, roadway reconfiguration roadway striping is part of the Serramonte Blvd/Collins Ave Master Plan. These improvements have been separated for the Master Plan Project (CIP#905) for potential grant funding. This project is included in the city's 2022-2027 Capital Improvement Plan (CIP). As of November 17, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
339
Active Projects
175
Bidding Soon
3,205
All Active Projects
1,285
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.