BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2022 at 7:00 PM

Updated January 25, 2024

Site work and paving for a road / highway in Aurora, Colorado. Completed plans call for paving for a road / highway; and for site work for a road / highway.

Region: 1 Counties: Douglas Projects: NHPP083A-046 Contract ID: C24447 083A-046 UDBE Goal: 10.00% All questions shall be directed to the CDOT contacts listed above no later than 7:00 A.M. Monday of the week of bid opening. Final questions and answers will be posted no later than Tuesday morning of bid opening week. This is a resurfacing project that includes a 1 inch mill and fill with SMA on SH 30 (S. Parker Rd) between Stroh and Hilltop. The work will also include, curb & gutter, curb ramps, signal detectors, temporary traffic control, and temporary erosion control. It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 (X) Between $1,000,000 and $5,000,000 ( ) Between $5,000,000 and $20,000,000 ( ) Greater than $20,000,000 CODOT - 003 - Resurfacing Includes A 1 Inch Mill and Fill With SMA on SH 30 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$3,893,820.00

Public - State/Provincial

Paving, Site Work

192

5

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
1
Bidding Soon
962
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2022

February 6, 2023

Project location map

CO-30, Aurora, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.