BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2022 at 7:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Seattle, Washington. Contact the soliciting agency for additional information.

Seattle Public Utilities (SPU) is requesting qualifications from qualified consultant teams to provide On-Call Modeling and Analysis support for all drainage, wastewater, and combined systems. Services may include system network modeling, drainage, and wastewater basin modeling, CSO compliance modeling, Digital Model development, problem identification, survey, mapping, precipitation statistical analysis, field reconnaissance, model review and analysis, long-term model simulations, calibration, validation, conversion and gathering of anecdotal information. Development of and updates to custom software tools used by SPU to support modeling activities, complex optimization modeling and analyses, and green stormwater infrastructure (GSI) evaluations. Additional services may include support for programmatic planning and identification of flow monitoring locations but will not provide for the installation or purchase of monitoring equipment, data collection, evaluation, and QA/QC of the data; this will be completed under a separate contract. The Contract will be executed for a period of three (3) years, with the option to extend up to an additional two (2) years. Work assignments will be developed iteratively over the course of the contract with varying dates for milestones and deliverables depending on the scope. The total of all Work Assignments under the Contract is estimated to be in the range of $4,000,000 to $5,500,000. SPU does not guarantee a specific volume of work under the Contract. Prebid conference - join by phone at the following: +1-206-686-8357; Phone Conference ID: 907 756 951#. SPU will review the scope of work, consultant expectations, and answer questions from the prospective bidders. Although attendance at this meeting is not mandatory, attendance is highly encouraged. Written questions related to this RFQ/P are encouraged and shall be directed to Sherry Shaffer, Contract Administrator & SPU's designated contact person, at sherry.shaffer@seattle.gov. To facilitate preparation of responses to questions, please submit questions by no later than 3:00 PM Pacific Time on Monday, December 5, 2022. All responses to questions will be posted at website. The City of Seattle is an Equal Opportunity Employer and selection of the Consultant is subject to applicable laws and ordinances regarding equal opportunity employment. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

$5,500,000.00

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
107
Bidding Soon
1,767
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2023

Project location map

Multiple Locations, Seattle, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.