BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2022 at 7:00 PM

Updated January 25, 2024

Site work and paving for a civil project in Beloit, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Solicitation ID: SW-01 Route : STH 081E County : 53 - Rock County Limit : ROCK RIVER B-53- 172 & B-53-104 Anticipated Construction Cost: $9,000,000-$9,999,999 The structures need treatment to extend their service lives. This perpetuation project is a bridge rehabilitation project in Rock County. The two structures on the project are B-53-0104 (CTH Q over Rock River- 7-span, steel plate girder bridge built in 1972) and B-53-0172 (STH 81 over Rock River-- 6-span, 54" PSG bridge built in 1996) and they both cross the Rock River. Work on structure B-53-104 includes replacement of the deck, joint replacement, approach slab replacement, concrete surface repair, spot painting of girders, and street lighting. Work on B-53-172 includes Joint replacement, approach slab replacement, and concrete surface repair Consistent with FDM 8-1-1.2 the project is divided into two stages: 1) all effort through environmental document and associated preliminary engineering and 2) final design. Upon selection WisDOT will negotiate the first stage contract with the consultant. WisDOT may choose to negotiate the second stage contract with the selected consultant, or a new solicitation for final design may be advertised. The design services requested in this solicitation may, at the discretion of the department, include a separate contract to provide design clarifications to construction project engineers during construction. Advertised Fixed Fee %: 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interviews will not be conducted The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - Perpetuation - Bridge Rehabilitation *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Bridges / Tunnels

$10,000,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
807
Active Projects
448
Bidding Soon
3,966
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2023

Project location map

WI-81, Beloit, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.