BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Terrell, Texas. Completed plans call for the renovation of a water / sewer project; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Project location: Project site is located at the intersection of Spur 557 and U.S. Highway 80 on the north side of U.S. Highway 80, in Kaufman County, Texas. Project scope shall include the assembly of a steel package wastewater treatment plant; installation of equipment and associated electrical components; yard piping; fence and construction of on-site lift station. Project scope shall include furnishing and delivering a 100,000 gpd wastewater treatment plant; plant components include two (2) 52-ft rectangular basins for aeration and aerobic digestion; one (1) 40-ft diameter clarifier; one (1) 32-ft rectangular basin for chlorine contact; and all ancillary equipment and associated electrical components, including but not limited to, two (2) positive displacement blowers, all air drop diffusers, air lift pumps, piping, non-potable water system, bar screen, handrails and walkways, etc.; facility must be able to achieve a wastewater effluent with the following parameters: CBOD5 of 10 mg/l; TSS of 15 mg/l; NH3-N of 3 mg/l; and less than 126 MPN/100 ml E. coli. The above described construction will be performed in accordance with plans and specifications and any addenda thereto which may be issued prior to the opening of bids. P-4204 TBPLS No. 10092300 TBPE No. F-726 Each Bid must be accompanied by a Certified or Cashier's Check, from a responsible bank in the State of Texas, or a Bid Bond, issued by a surety legally authorized to do business in the State of Texas, equal to two percent (2%) of the total bid amount. Make the Cashier's Check, Certified Check or Bid Bond payable to the Owner. The Owner reserves the right to reject any or all bids or to accept any bid deemed advantageous to it and waive informalities in bidding. All bids received after the closing time above designated will be returned unopened. Project location: Project site is located at the intersection of Spur 557 and U.S. Highway 80 on the north side of U.S. Highway 80, in Kaufman County, Texas.

Bid Results

Water / Sewer

$1,612,500.00

Public - County

Paving, Renovation, Site Work

39

11

46

9

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
368
Active Projects
206
Bidding Soon
5,025
All Active Projects
2,030
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 21, 2022

January 20, 2023

September 17, 2023

img_map_placeholder

US-80 & TX-557 Spur, Terrell, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.