BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Miramichi, New Brunswick. Completed plans call for site work for a water / sewer project.

The work under this Contract includes, but is not limited to the following: .1 Provide all labour and materials to perform the work as indicated on the drawings and as described herein to the best standards of the industry and in accordance with Local Authority Having Jurisdiction requirements. .2 Obtain all licenses, permits and approvals to perform the work under this contract. .3 Provide protection of building, equipment and systems from all work performed under this contract. .4 Provide for clean-up of all areas during and at the completion of work. .5 Provide for all heavy lifting equipment operations and safety requirements. .6 Building will be occupied during regular working hours. Therefore, all work shall be executed in such a manner as to provide minimum interference with the use of the existing premises by the occupants and provide maximum safety of the occupants during the work period. .7 Provide all training, start-up reporting and close-out documentation. .8 Provide user training and Operations and Maintenance Manuals. .9 All work shall be done in accordance with all codes and standards related to the work being executed under this contract, including but not limited to: - National Building Code of Canada (NBC) - 2015. - National Plumbing Code of Canada (NPC) - 2015. - CSA-Z317.13.22 Infection Control During Construction, Renovation, and Maintenance of Health Care Facilities. .10 Provide for cutting, patching of existing floors and walls as required to permit the installation of new drainage as indicated on drawings. .11 Remove existing elevator sump pumps and controller. .12 Provide and install new elevator sump pumps, controllers and piping as noted in the drawings. .13 Provide all cutting and patching as required. Repair damaged surfaces to match existing including painting. Provide firestopping where fire rated walls are penetrated (if applicable). .14 Provide and Install new electrical as noted on Electrical Drawings. .15 The Hosptital will be handling the Infection Control for the project. The Contractor to coordinate with the Hospital and follow all Infection Control procedures designated by the Hospital. Documents are available through the Construction Association of NB. ADDRESS ALL INQUIRIES TO: Scott Mowery, P.Eng. 506-847-8285 smowery@mcw.com Award is subject to final approval.

Award

Water / Sewer

$70,925.00

Public - State/Provincial

Site Work

3

8

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
5
Bidding Soon
93
All Active Projects
37
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2022

January 6, 2023

img_map_placeholder

500 Water St, Miramichi, NB

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.