Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 8, 2022 at 7:00 PM

Updated January 25, 2024

Demolition and site work for a residential development in Topeka, Kansas. Completed plans call for the demolition of a residential development; and for site work for a residential development.

For a Residential demolition of a house structure. The City will arrange for the disconnection of utility service connections. Before starting demolition the contractor shall verify that all utilities have been disconnected. The contractor is responsible for calling dig safe to get locates. The sewer shall be capped. Demolish and remove the house and foundation. All demolition materials shall be dumped in a demolition landfill licensed by Kansas Department of Health and Environment. Demolition landfill receipts to show landfill usage is required prior to payment for services rendered. Remove concrete, bicycle frame, household furniture, building material, bathroom sinks, three 4x4 posts in back yard, limbs, branches and wood on ground, loose trash, debris and rubbish from the premises. Remove all interior sidewalks between the City sidewalk and the back of the property. Remove the blue wood privacy fence running from the Northwest corner of the front porch to the North property line. Remove the chain link fence running from the Northeast corner of the house to the North property line. Remove the chain link fence running from the Southeast corner of the house to the South property line. All trees, branches and limbs on the ground, incidental to the demolition of the structures. Trees can only be removed if affecting the demolition of the structure. (Include any tree removal necessary with the bid of the structure) NOTE if a tree in the City ROW needs to be removed the contractor is responsible for contacting the Code Inspector prior to the removal of the tree. All grass/vegetation shall be cut back below the 12 inches to comply with the City of Topeka ordinance. The foundation hole shall be inspected to insure no demolition debris is in it prior to back filing of the excavation. The site shall be graded to drain away any standing water or drainage way and the ground shall be grass seed ready.

Bid Results

Residential Subdivision

$12,000.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
87
Bidding Soon
1,202
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2022

January 6, 2023

Project location map

1278 SW Lane St, Topeka, KS

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed