BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a water / sewer project in Lewis Center, Ohio. Completed plans call for the renovation of a water / sewer project.

Staff at the Alum Creek Water Reclamation Facility (ACWRF) have identified needs for improvements at the treatment plant. The plant, constructed in 2001-2002, currently receives an average daily flow of approximately 5.2 MGD. Given the plant has been in operation for approximately 20 years and in being proactive in identifying needs for improvement, the Delaware County Regional Sewer District previously contracted with ms consultants to evaluate potential alternatives related to tertiary and post treatment operations. In general, the improvements considered as part of that evaluation pertain to three main areas: the Post Treatment Building, the Filter Building, and the Administration Building. The evaluation was completed in February, 2022. The following provides a summary of the evaluation along with final recommendations for improvements. Note not all information related to the evaluation and the decisions made are included as part of this engineering report. The total project budget is currently estimated at $3,500,000. In the Post Treatment Building, the existing UV disinfection system has reached the end of its useful life. The evaluation considered proposals provided by four different UV manufacturers, ultimately with a vertical UV system matching the existing system being recommended. Additionally, existing slide gates in the post treatment building are not operating correctly and are in need of replacement. Alternatives for the slide gate materials and actuator manufacturers were evaluated with stainless steel slide gates being selected. Regarding the Filter Building, DCRSD is able to meet their discharge permit requirements without the use of the filters. The filter building is an approximately 14,000 square foot structure and consists of eight (8) filters. Four (4) of the filters are currently non-operational and all of the filters are reaching the end of their useful life with a typical life expectancy of 20 years. Alternatives for the decommissioning of the existing filters and converting the Filter Building into a storage facility for plant maintenance equipment and spare parts for DCRSD's plant and collection system operations were provided. Ultimately, filters 7 and 8 will be converted to temporary storage by filling in the filter bays and placing pre-fabricated panels on top for storage space. ACWRF currently utilizes water furnaces for heating and cooling in the Administration Building and Maintenance Building. Water furnaces are maintenance intensive and costly to operate. Combined with eight (8) water furnaces at ACWRF, DCRSD also has six (6) additional water furnaces at the Olentangy Environmental Control Center (OECC) and Central Maintenance Facility (CMF). A summary of the selected alternative to replace these water furnaces has been provided, which will reduce maintenance and monthly operating costs. Submit all questions regarding this RFQ in writing (no phone calls please) to Brad Stanton at bstanton@co.delaware.oh.us on or before November 29, 2022. Responses will be distributed and posted by December 6, 2022. The name of the party submitting a question will not be included on the Q&A document. Anticipated Schedule CMAR Services Start: February 2023 GMP Approval: August 2023 Construction Stage Start: September 2023 Construction Stage Completed: December 2024 CMAR Services Completed: February 2025

Post-Bid

Water / Sewer

$3,500,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
79
Bidding Soon
1,099
All Active Projects
445
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2022

September 1, 2023

img_map_placeholder

7767 Walker Wood Blvd, Lewis Center, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.