Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Lewis Center, Ohio. Completed plans call for the renovation of a water / sewer project.
Staff at the Alum Creek Water Reclamation Facility (ACWRF) have identified needs for improvements at the treatment plant. The plant, constructed in 2001-2002, currently receives an average daily flow of approximately 5.2 MGD. Given the plant has been in operation for approximately 20 years and in being proactive in identifying needs for improvement, the Delaware County Regional Sewer District previously contracted with ms consultants to evaluate potential alternatives related to tertiary and post treatment operations. In general, the improvements considered as part of that evaluation pertain to three main areas: the Post Treatment Building, the Filter Building, and the Administration Building. The evaluation was completed in February, 2022. The following provides a summary of the evaluation along with final recommendations for improvements. Note not all information related to the evaluation and the decisions made are included as part of this engineering report. The total project budget is currently estimated at $3,500,000. In the Post Treatment Building, the existing UV disinfection system has reached the end of its useful life. The evaluation considered proposals provided by four different UV manufacturers, ultimately with a vertical UV system matching the existing system being recommended. Additionally, existing slide gates in the post treatment building are not operating correctly and are in need of replacement. Alternatives for the slide gate materials and actuator manufacturers were evaluated with stainless steel slide gates being selected. Regarding the Filter Building, DCRSD is able to meet their discharge permit requirements without the use of the filters. The filter building is an approximately 14,000 square foot structure and consists of eight (8) filters. Four (4) of the filters are currently non-operational and all of the filters are reaching the end of their useful life with a typical life expectancy of 20 years. Alternatives for the decommissioning of the existing filters and converting the Filter Building into a storage facility for plant maintenance equipment and spare parts for DCRSD's plant and collection system operations were provided. Ultimately, filters 7 and 8 will be converted to temporary storage by filling in the filter bays and placing pre-fabricated panels on top for storage space. ACWRF currently utilizes water furnaces for heating and cooling in the Administration Building and Maintenance Building. Water furnaces are maintenance intensive and costly to operate. Combined with eight (8) water furnaces at ACWRF, DCRSD also has six (6) additional water furnaces at the Olentangy Environmental Control Center (OECC) and Central Maintenance Facility (CMF). A summary of the selected alternative to replace these water furnaces has been provided, which will reduce maintenance and monthly operating costs. Submit all questions regarding this RFQ in writing (no phone calls please) to Brad Stanton at bstanton@co.delaware.oh.us on or before November 29, 2022. Responses will be distributed and posted by December 6, 2022. The name of the party submitting a question will not be included on the Q&A document. Anticipated Schedule CMAR Services Start: February 2023 GMP Approval: August 2023 Construction Stage Start: September 2023 Construction Stage Completed: December 2024 CMAR Services Completed: February 2025
Post-Bid
Water / Sewer
$3,500,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 13, 2022
September 1, 2023
7767 Walker Wood Blvd, Lewis Center, OH
Related To This Project
Lewis Center, OH
Bid Date: Apr 20 2022
Lewis Center, OH
Bid Date: Dec 03 2021
Lewis Center, OH
Bid Date: Apr 12 2022
Lewis Center, OH
Bid Date: Apr 14 2021
Lewis Center, OH
Bid Date: May 19 2022
Lewis Center, OH
Bid Date: Jan 12 2023
Lewis Center, OH
--
Lewis Center, OH
Bid Date: Jul 07 2022
Lewis Center, OH
Bid Date: Dec 13 2022
Lewis Center, OH
Bid Date: Dec 16 2022
Lewis Center, OH
Bid Date: Jul 07 2022
Lewis Center, OH
Bid Date: Nov 03 2022
Marion, OH
Bid Date: Jun 14 2022
Chagrin Falls, OH
Bid Date: Dec 27 2022
Cincinnati, OH
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.