BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a playground / park / athletic field in Sacramento, California. Completed plans call for the renovation of a playground / park / athletic field.

As of February 09th, 2023, project has not been awarded yet. No timeline of award was established. Remove and replace existing roofing and related trims and flashings, repair existing adobe wall where indicated on drawings, repair wood posts where indicated on the drawings, and seismic upgrades per structural drawings at SUTTERS FORT STATE HISTORIC PARK in Sacramento, California. Any discrepancies, omissions, ambiguities, or conflicts in or among the contract documents or doubts as to meaning shall be brought to the States attention by emailing your questions to Merrilee.Byrnes@parks.ca.gov NO LATER THAN 2 p.m., seven (7) calendar days prior to bid opening date. Answers will be provided by Addendum on this website, and it is the responsibility of the bidders to download any addendum as needed. Participation in Disabled Veteran Business Enterprise Program (DVBE): The minimum DVBE participation percentage goal is 6%. Failure to fulfill the DVBE requirement will render your bid non-responsive. DVBE Incentive: For evaluation purposes only, an incentive will be given to bidders who exceed the 6% DVBE participation requirements. Refer to the DVBE forms beginning with DPR 479IP. Small Business Preference and Small Business Subcontractor Participation: A five percent (5%) Small Business Preference will be granted to properly certified small businesses (a completed STD 811 Form must be submitted with the bid proposal). Public Works Contractor Registration Program SB 854: 1) No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. 2) No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. 3) This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Engineer's Estimate: $800,000 to $1,000,000

Bid Results

Playgrounds / Parks / Athletic Fields

$1,380,000.00

Public - State/Provincial

Renovation

16

19

4

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
81
Bidding Soon
1,529
All Active Projects
630
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2022

February 20, 2023

img_map_placeholder

2701 L St, Sacramento, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.