BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a pre-engineered storage facility in Tuscola, Illinois. Working plans call for the addition of a 4,000-square-foot pre-engineered storage facility; for the demolition of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

As of March 31, 2023, bids were rejected. No definite date for the rebid. 40'x100' Addition to existing pole barn building. Addition to consist of concrete drilled piers, grade beam, sloped 6" concrete slab w/ trench drains. Pole barn building w/ pre-engineered wood trusses; 2x wall girts and purlins & metal siding and roofing panels to match existing. A three lane shooting range is included in the scope and consists of 8" concrete walls, steel frame & metal decking supporting concrete ceiling. Addition to: Tuscola Maintenance Building 00030 - 1 UAA No. 22009 CONTRACTS Bids will be taken and Contracts awarded as follows: CONTRACT NO. 1 - Complete Construction Work. BID SECURITY A Bid Bond or Certified Check made payable to the Owner in the amount of five percent (5%) of the bid shall be submitted with each bid as guarantee that the bid will not be withdrawn within thirty (30) days after the date of opening of bids, and that the successful bidder will enter into a Contract for the work awarded him. The successful bidder will be required to furnish a satisfactory Performance Bond and a Labor and Material Payment Bond for the full amount of the bid accepted. PREVAILING WAGE RATES Contractors and Subcontractors shall be required to comply with the Prevailing Wage Rates as determined by the Illinois Department of Labor and adopted by the County. SALES TAXES This project is exempt from sales tax. The Owner will provide the Contractor with tax exempt identification number upon request. PROPOSAL REJECTION AND IRREGULARITIES The right is reserved by the Owner to reject any or all bids or waive any informality in any bid and to accept any bid considered advantageous to the Owner.

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$800,000.00

Public - City

Addition, Demolition, Site Work

28

17

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
26
Bidding Soon
415
All Active Projects
181
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2023

September 29, 2023

img_map_placeholder

1009 E Wilson St, Tuscola, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.