BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in N Riverside, Illinois. Completed plans call for the renovation of a 28,561-square-foot, one-story above grade, one-story below grade educational facility.

The work includes, but is not limited to,the renovation of an approximately 3,100 square foot lower level auditorium space in to flexible music, library, and performance space and the renovation of an 800 square foot of existing library space into an Art classroom. Included In this work is the replacement of an existing boiler system and existing parking lots. Refer to the Drawings and Project Manual for the full extent of the Work. As of December 2, 2022, addendums 1-3 have been issued. All bids offered must be accompanied by bid security in the form of certified check or bid bond made payable to the Owner in the amount of not less than ten percent (10%) of the amount of the aggregate of the bid as a guarantee that if the bid is accepted, a contract will be entered into and the performance of the contract properly secured. The successful bidder for the project is required to furnish Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the bid amount, with sureties to be approved by the Owner, and in the form required by the Bidding Documents. The successful bidder is required to pay the general prevailing wage for work under this Contract as ascertained by the Illinois Department of Labor, and shall submit certified payroll records, in compliance with the Prevailing Wage Act (820 ILCS 130) and the requirements of the Bidding Documents. The Board of Education reserves the right to reject any or all bids or any part thereof. Phase 1: Contractor shall commence construction on or as closely as possible to March 27, 2023 in the lower level Auditorium as indicated in the drawingsandwork shall be Substantially Complete no later than July 31, 2023and achieve Final Completion (Punch List items completed) by August 11, 2023. Phase 2: Contractor shall commence construction on or as closely as possible to June 13, 2023 in the first level Lobby, Art Room, Upper level Gymnasium, and North and South Parking Lots as indicated in the drawingsandwork shall be Substantially Complete no later than July 31, 2023 and achieve Final Completion (Punch List items completed) by August 11, 2023.

Award

Theaters / Auditoriums

$2,940,000.00

Public - City

Renovation

97

29

45

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
119
Bidding Soon
1,790
All Active Projects
810
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2022

March 27, 2023

img_map_placeholder

735 Leesley Rd, N Riverside, IL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.