Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and new construction of a transportation facility in Orlando, Florida. Completed plans call for the demolition of a transportation facility; for the construction of a transportation facility; and for site work for a transportation facility.
Pursuant to 2 CFR Part 200, Section 287.055, Florida Statutes, and the policies and procedures of the Greater Orlando Aviation Authority (Authority), notice is hereby given that Statements of Qualifications (SOQs) are invited from design-build firms (Proposers) for the design, construction, operation, and maintenance of BP-477, Automated People Mover (APM) Operating System (OS) for Airside 2 and Airside 4 (the Project), at the Orlando International Airport (the Airport). This Project includes the replacement of the existing APM OS serving Airsides 2 and 4 of the North Terminal Complex (NTC). The Airside 2 APM OS was first placed into service in 2000. The Airside 4 APM System was first placed into service in 1990 and the cars were replaced with new cars in 2008. The Airsides 2 and 4 APM systems are dual-lane shuttles with an approximate length of 2,000 feet on each guideway lane. Each guideway lane utilizes a 3-Car Alstom (formerly Bombardier) CX-100 technology train and operates at an approximate round trip time of 208-seconds including a 40-second dwell time. At a minimum, the Project will include replacement of all vehicles, running surfaces, central control equipment in the Airports Comm Center, all other required subsystems (communications, command and controls, power distribution, station doors, etc.) and all modifications, if any, required to existing APM stations, guideway and other facilities to accommodate the proposed APM OS. Maintaining passenger service to Airsides 2 and 4 during the work and minimizing the time that any one of the two APM lanes to each Airside is out of service during construction are essential. Work shall be completed (i.e., both Airsides 2 and 4 fully functional for passenger service) no later than April 2, 2027. The Project will include all services necessary for the turnkey delivery of the APM OS for Airsides 2 and 4, including design coordination; on-site verification and coordination; the integration of the Contractors designs and Work with the designs and infrastructure provided by the Contractor and others; all permitting activities; coordination with adjacent facilities, projects and operations (whether existing or future); obtaining all necessary government approvals; performing all required Project management; quality control; analysis; design; engineering; documentation; manufacturing, fabrication, shipping, expediting, storing of materials; erection, construction, installation, debugging, integration, testing and commissioning; safety certification of the entire APM OS; including vehicles, guidance equipment, communications equipment, command and control equipment, station equipment, power distribution system, supporting equipment for maintenance facility operations, public information, and Closed Circuit Television (CCTV) systems; and all other related services, including coordination with the Authority, its Consultants, the City of Orlando and all agencies having jurisdiction over the Project. After safety certification, the Proposer will provide Operation and Maintenance (O&M) Services to the Authority for an initial ten year term with two Authority options to extend for an additional ten years with each option. Question Deadline 12/05/2022 Written inquiries regarding this procurement shall be directed to Mr. Scott Shedek, Director of Construction, Greater Orlando Aviation Authority, Orlando International Airport, via email: BP477@g The Airsides 2 and 4 APM Fixed Facilities (i.e., stations, guideway structure, emergency walkway, APM power substations, on-line maintenance facility, and central control) are existing and operational. Any design, modifications, or changes to any of the existing facilities and any new facilities required to accommodate the proposed APM OS is part of the scope of work for this Project. Proposers must be a design-build firm, as defined by Florida Statutes 287.055, which means the Proposer must be a partnership, corporation, or other legal entity that: is certified under Florida Statute 489.119 to engage in contracting through a certified or registered general contractor or a certified or registered building contractor as the qualifying agent; or is certified under Florida Statute 471.023 to practice or to offer to practice engineering; or certified under Florida Statute 481.219 to practice or to offer to practice architecture; or certified under Florida Statute 481.319 to practice or to offer to practice landscape architecture. The award, if made, will consist of a design-build contract and an operate-maintain contract, both of which will be executed simultaneously after Board approval. The Authority intends to issue the Notice to Proceed on the Airsides 2 and 4 operate-maintain contract in phases, as each phase of construction, installation, testing and commissioning on each of the four APM system lanes has been completed. The Disadvantage Business Enterprise (DBE) Participation Goals for the Design-Build contract (Phase 1) and for the Operate-Maintain contract (Phase 2) have been determined separately for each contract and are set forth in the Submission Requirements. The Project Scope, the Submission Requirements, Disadvantage Business Enterprise (DBE) Participation Program for the Statements of Qualifications and questions regarding the Project will be reviewed at the Pre-Submittal Conference. Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all Proposers that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit proposals in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The award and contracts referenced in this Advertisement are subject to approval by the Authority prior to any work being performed.
Post-Bid
Transportation Terminals
$9,000.00
Public - City
Demolition, New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 20, 2022
April 20, 2023
1 Jeff Fuqua Blvd, Orlando, FL
Related To This Project
Orlando, FL
Bid Date: Dec 08 2022
Orlando, FL
--
Orlando, FL
--
Orlando, FL
Bid Date: Dec 23 2022
Orlando, FL
Bid Date: Jan 06 2023
Orlando, FL
Bid Date: Dec 12 2022
Orlando, FL
Bid Date: Jan 10 2023
Orlando, FL
Bid Date: Jan 10 2023
Orlando, FL
--
Orlando, FL
--
Orlando, FL
--
Orlando, FL
--
Orlando, FL
--
Orlando, FL
Bid Date: Mar 05 2024
Orlando, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.