BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in San Antonio, Texas. Design plans call for the renovation of a educational facility.

The school district’s bond was approved by voters on May 6, 2023, it is currently unknown if an architect, construction manager, and general contractor have been contracted with the school district. Further details regarding design and construction timelines have not been released. The bond calls for: Proposition A The majority of AHISD schools were built in the 1950s. Proposition A includes updates and renovations to all campuses, technology infrastructure improvements, safety and security, and new school buses. A new Howard Early Childhood Center building would be constructed, along with renovations to the original building of Alamo Heights High School. Proposition A would also fund a new Central Office/Learning Center and a softball field located at the Robbins campus complex that already includes the Natatorium and Tennis Center. Additional parking and traffic flow improvements are also part of this proposition. Proposition B would fund a Visitor Bleacher/Athletic Facility at Orem Stadium. The visitor side of the stadium was constructed in 1947 and was not addressed in previous bonds. The proposition includes funding for multipurpose meeting space, locker rooms, restrooms, concessions, team space, and student Sports Media program equipment. Proposition C would fund technology including student and staff devices as part of ongoing lifecycle replacements. It is estimated that over the next eight years the I&S tax rate will increase by 9.52 cents. However, the estimated M&O rate will decrease by 15 cents, so the overall tax rate that homeowners and businesses will see is estimated to be reduced by 5.48 cents over those eight years. Today, for every $100,000 of taxable value, the total tax is $94.63 per month. It is anticipated that the I&S tax rate will increase by $8 per month if the bond proposal is approved and the bonds are issued. However, with the decrease of the M&O rate, the total tax in the year 2032 for every $100,000 of taxable value is estimated to be $86.50 per month. Information regarding design firm and general contractor selection timelines have not been released. Further details regarding design and firm construction timelines have not been identified.

Design

Educational

$371,000,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
25
Bidding Soon
1,953
All Active Projects
762
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2024

img_map_placeholder

Multiple Locations, San Antonio, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.