Published March 23, 2023 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a parking garage in Napanoch, New York. Completed plans call for the construction of a parking garage; and for site work for a parking garage.

**As of March 23, 2023, the project has not yet been awarded. The anticipated date for award is not yet determined. New Highway Garage & Rehabilitation Project. Bids will be received for the Multiple Contract Project consisting of the following prime contracts which cover both New Highway Garage Facility & Rehabilitation of the Existing Highway Garage Facility: General Construction Plumbing Construction Mechanical Construction Electrical Construction Project Construction of the New Highway Facility must be completed by December 29, 2023. Project Construction of the Existing Highway Facility must be completed by April 5, 2024. Cash deposits will not be accepted. Any Bidder requiring documents to be shipped shall make arrangements with REV and pay for all packaging and shipping costs. Any Bidder who submitted completed Bid Forms to the Town of Wawarsing, upon returning such set-in good condition within thirty days following the award of the contract or rejection of the bids, will be refunded his full payment. Deposits will not be refunded to any non-bidder (including material suppliers, subcontractors, or those that provide quotes to Bidders). Questions should be sent to Cody Messier, PE via email at cmessier@delawareengineering.com. Each bid must be accompanied by security in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Information for Bidders. No Bidder may withdraw his bid within forty-five (45) days after the actual date of opening thereof. This is an exempt capital improvement project, and Bidders shall not include taxes in the cost of materials which are to be incorporated into the work, and which are to be separately sold by the Contractor to the Town of Wawarsing prior to incorporation into the work of the Contract. Bids may be held by the Owner for a period not to exceed forty-five (45) days from the date of the opening of Bid for the purpose of reviewing the bids and investigating the qualifications of the bidder(s) and the subsequent approval of the bids and related documents by the Owner. The Owner reserves the right to reject any and all bids, or waive any informalities in the bidding, without explanation, and to select the Bid, the acceptance of which, in its judgement, will best assure the efficient performance of the work. In addition, the contractor must comply, if applicable, with Labor Law 220, section 220-h, which requires that on all public work projects of at least $250,000.00, all laborers, workers and mechanics on the site be certified as having successfully completed the OSHA 10-hour construction safety and health course. The right is reserved to waive any informalities in the Bid and to reject any or all Bids. Bid results - General General- Key Cons $2,308,882.00 New Garage- Butler Cons-$3,642,853.80 Existing Garage- Darlind -$1,068,000.00 OH&P- Darlind -$500,000.00 Electrical General- RLJ -$280,000.00 New Garage- RLJ -$417,000.00 Existing Garage- J&J -$65,000.00 OH&P- RLJ- $117,000.0 Plumbing General- S&O -$81,830.00 New Garage- S&O -$418,975.00 Existing Garage- Aero-$16,100.00 OH&P- Aero-$25,690.00 Mechanical General- S&O-$100,948.00 New Garage- S&O-$517,910.00 Existing Garage- D&J -$76,000.00 OH&P- S&O-$59,183.00

Bid Results

Parking Garage

$9,695,372.00

Public - City

New Construction, Site Work

112

25

112

7

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Manufacturer?s Field Services, Temporary Facilities and Controls, Temporary Construction, Temporary Barriers and Enclosures, Temporary Tree and Plant Protection, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Vapor Retarders, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Window Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Furniture, Seating, Chairs
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Fuel-Fired Heaters, Gas-Fired Radiant Heaters, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Bored Piles, Drilled Concrete Piers and Shafts, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Fans, Blowers and Pumps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
382
Active Projects
236
Bidding Soon
3,418
All Active Projects
1,509
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2023

April 10, 2023

img_map_placeholder

7285 US-209, Napanoch, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wawarsing Highway Garage - Electrical

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.