EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 4, 2023 at 7:00 PM

Updated October 1, 2024

Site work for a mixed-use development in Ada, Oklahoma. Completed plans call for site work for a 78,000-square-foot educational facility; and water / sewer project.

The Project is being bid in bid packages and shall be constructed in accordance with the Drawings and Specifications prepared by Redland Childers Architects and shall consist of furnishing all materials, supplies, equipment, tools, services, labor and incidental work as required to construct the project described in general as follows: Early Site Package for a future 78,000sf elementary school. Current packages include site grading, building pad, storm drainage, watermain extension, and sewer relocation. Bid Packages include: #2A: Site Work and Site Demo #2B: Site Utilities and Site Utility Demo Pre-Bid Conference - There will not be a pre bid conference. Questions should be directed to: Michael Barnes, Construction Manager 19080 CR 1590 Ada, Oklahoma 74820 Phone: (580) 332-1404 All bids over $50,000 must be accompanied by a certified check, cashier's check, or bid bond, payable without reserve, to the owner and Construction Manager as dual obligees in an amount not less than five percent (5%) of the total amount of the Bid. This security is given as a guarantee that the Bidder will enter into a Contract with the Construction Manager for the construction of this project, furnish satisfactory labor and materials, maintenance and performance bonds and insurance certificates within ten (10) days after notice of award, and in the event of failure to do so, shall pay to the Owner the sum of five percent (5%) of said bid as liquidated damages. No Bidder may withdraw his bid for a period of thirty (30) days after the bid opening date. Bids received more than ninety-six (96) hours before the time set for receiving bids as well as bids received after the time set for receipt of bids will not be considered and will be returned unopened. The Owner reserves the right to reject any or all bids and to waive formalities or minor irregularities in any bid, and to determine and select the lowest and best bid. The amount of the deposit for drawings and specifications will be returned to each actual Bidder who returns the drawings and specifications UNMARKED, complete with all Addenda, and in good condition within ten (10) days after opening of bids.

Post-Bid

Educational

$1,000,000.00

Public - City

Site Work

14

16

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Wall Finishes, Stone Facing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Exterior Specialties, Protective Covers, Canopies
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
45
Bidding Soon
490
All Active Projects
229
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2023

February 6, 2023

img_map_placeholder

16220 County Road 1560,, Ada, OK

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

New 1st- 2nd Grade Center - Early Dirt Package

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.