BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for an educational facility in Ada, Oklahoma. Completed plans call for site work for a educational facility.

The Project is being bid in bid packages and shall be constructed in accordance with the Drawings and Specifications prepared by Redland Childers Architects and shall consist of furnishing all materials, supplies, equipment, tools, services, labor and incidental work as required to construct the project described in general as follows: Early Site Package for a future 78,000sf elementary school. Current packages include site grading, building pad, storm drainage, watermain extension, and sewer relocation. Bid Packages include: #2A: Site Work and Site Demo #2B: Site Utilities and Site Utility Demo Questions should be directed to: Michael Barnes, Construction Manager 19080 CR 1590 Ada, Oklahoma 74820 Phone: (580) 332-1404 Pre-Bid Conference - There will not be a pre bid conference Material specifications are specific in their requirements. Any Bidder who wishes to propose an alternate or substitute material for bidding shall follow the procedures outlined in the Instructions to Bidders. Each Bidder will be required to provide an AIA Document A305, Contractors Qualification Statement, at the time of the bid opening. All bids over $50,000 must be accompanied by a certified check, cashiers check, or bid bond, payable without reserve, to the owner and Construction Manager as dual obligees in an amount not less than five percent (5%) of the total amount of the Bid. This security is given as a guarantee that the Bidder will enter into a Contract with the Construction Manager for the construction of this project, furnish satisfactory labor and materials, maintenance and performance bonds and insurance certificates within ten (10) days after notice of award, and in the event of failure to do so, shall pay to the Owner the sum of five percent (5%) of said bid as liquidated damages. No Bidder may withdraw his bid for a period of thirty (30) days after the bid opening date. Bids received more than ninety-six (96) hours before the time set for receiving bids as well as bids received after the time set for receipt of bids will not be considered and will be returned unopened. The Owner reserves the right to reject any or all bids and to waive formalities or minor irregularities in any bid, and to determine and select the lowest and best bid. Bid results: 2A-Sewer Wood Dirts Contractors - $716,669 2B Sewer - Morris Plumbing - $36,750.00 Water 1 -Morris Plumbing - $43,050.00 Water 2-Morris Plumbing - $82,425.00

Bid Results

Educational

$878,894.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
48
Bidding Soon
420
All Active Projects
188
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2023

February 6, 2023

img_map_placeholder

To Be Determined, Ada, OK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.