BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a municipal facility in Cuba, Missouri. Completed plans call for the addition of a 1,750-square-foot municipal facility; for the demolition of a municipal facility; for the renovation of a 1,500-square-foot municipal facility; and for site work for a municipal facility.

The project consists of complete remodeling and renovation to an existing approx. 1500 sq.ft. wood framed building, along with additions, which will become a 3250 sq.ft. coroner's office. All equipment, materials and workmanship shall be in accordance with all project drawings, detailed specifications and documents prepared by AEA-Stack Design Group. Bidders having questions or requesting additional information should contact Irvin "Corky" Stack, P.E., Project Manager at AEA Stack Design Group. Proposals shall be submitted on the blank forms bound in the contract documents or issued in any addendum and provided for that purpose. The Owner intends to award the contract to the most responsive, responsible bidder submitting the lowest bid. The Crawford County Commission reserves the right to reject any and all bids considered by them to be materially unbalanced or non-responsive, and affirms their right to accept or reject any or all bids received, without limitation, and to waive or not to waive any or all irregularity, informality, or technicality in any bid, and to award the contract deemed by them to be in their best interest. The County of Crawford is an Equal Opportunity Employer and invites the submission of bids from minority and women-owned firms. Bid security in the amount of five percent (5%) of the bid amount must accompany each bid, in accordance with the Instructions to Bidders. As a condition of the Contract, the successful Bidder will be required to provide separate Performance and Payment Bonds, each in the amount of 100% of the Contract Amount. The Contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications. The wage rates applicable to this project have been predetermined as required by law and are set forth in the specifications. Upon signing the contract, the contractor and any subcontractor performing the work shall provide a ten-hour Occupational Safety and Health Administration (OSHA) construction safety program for their on-site employees which includes a course in construction safety and health approved by OSHA or a similar program approved by the Missouri Department of Labor and Industrial Relations which is at least as stringent as an approved OSHA program. All employees are required to complete the program within sixty (60) days of beginning work on such construction project. Any employee found on the worksite without documentation of the successful completion of such a course shall be afforded twenty (20) days to produce such documentation before being subject to removal from the project. Payment for the work under this contract will be made in cash in accordance with the payment provisions stipulated in the contract. The contract contains a provision for liquidated damages.

Award

Municipal

$407,125.00

Public - County

Addition, Demolition, Renovation, Site Work

1

7

44

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
40
Bidding Soon
822
All Active Projects
318
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 27, 2023

December 27, 2023

img_map_placeholder

409 S Franklin St, Cuba, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.