Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Covington, Georgia. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The proposed project would construct a replacement bridge carrying SR 81 over Dried Indian Creek. The bridge would be replaced at its existing location. Traffic would be maintained via an off-site detour during construction. Motorists traveling along SR 81 between Covington and Oxford would have to detour around the project location during construction using SR 12, I-20, and SR 162 that is approximately 19.5 miles long. The proposed structure would be approximately 68.0 feet long by 53.42 feet wide. This proposed bridge typical section includes three 12-foot lanes, and a 2-foot shoulder and 5.5-foot sidewalk on both sides. The proposed roadway approaches would consist of three 12-foot lanes, and 30 curb and gutter, 2 foot grass strip, and 5 foot sidewalk on both sides. The replacement bridge is proposed to be skewed approximately 25 degrees from normal to better align the opening with the direction of flow during storm events. County: Newton As of March 02, 2023, the project is in Final Planning status. Anticipated letting Month is June, 2023. GADOT - SR 81 at Dried Indian Creek in Covington *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Final Planning
Bridges / Tunnels
$2,000,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2023
GA-81, Covington, GA
Related To This Project
Covington, GA
Bid Date: Jun 16 2023
Covington, GA
Bid Date: Mar 17 2023
Covington, GA
Bid Date: Feb 15 2023
Covington, GA
--
Covington, GA
--
Covington, GA
Bid Date: Jul 25 2023
Covington, GA
Bid Date: Mar 10 2023
Covington, GA
Bid Date: Mar 09 2023
Covington, GA
--
Covington, GA
Bid Date: Jan 27 2023
Covington, GA
--
Covington, GA
Bid Date: Jan 20 2023
Covington, GA
Bid Date: Aug 18 2022
Covington, GA
Bid Date: Apr 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.