BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2024 at 7:00 PM

Updated November 22, 2024

Site work for a playground / park / athletic field in Hardeeville, South Carolina. Design plans call for site work for a playground / park / athletic field.

As of November 21, 2024, per owner, design team has been identified. They hope to bid the project out in early December 2024. All questions concerning this RFP must be submitted in writing no later than January 13, 2023 at 12:00 PM to the following: City of Hardeeville Matthew Davis, AICP Deputy City Manager 205 East Main Street PO Box 609 Hardeeville, SC 29927 843-784-2231 mdavis@hardeevillesc.gov Hardeeville, South Carolina is one of the fastest growing municipalities in the state. Over the past two decades the City has increased in area from a few square miles to greater than 57 square miles. Vast timber tracts covered many thousands of acres and thus rail played a large part in the development of the City by providing a means to transport this product. A train station located in what is the present downtown area spurred additional development. Over time US 17 developed and passed through the City and many auto and travel oriented businesses sprang up. As Interstate 95 was completed it functioned as a sort of bypass and Hardeeville no longer experienced as many travelers as in previous times. As timbering operations moved elsewhere these large tracts of land were sold to various interests, including residential consultants. The resort area of nearby Hilton Head Island, the growth of Bluffton, SC and the lure of pleasant weather and lower tax burdens beckoned to many to relocate to the lowcountry and Hardeeville. Many of the large previously timber tracts were annexed into the City for development. Sun City and Latitude Margaritaville; agerestricted communities, are currently the large drivers in population growth. However, there are thousands of new residential units in various stages of the development pipeline featuring a diversity of housing types. The Method of Contractor Selection has not been determined at this Time.

Design

Playgrounds / Parks / Athletic Fields

$2,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
36
Bidding Soon
817
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

Project location map

To Be Determined, Hardeeville, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.