BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2022 at 7:00 PM

Updated September 15, 2023

Renovation of a water / sewer project in Edmonton, Alberta. Conceptual plans call for the renovation of a water / sewer project.

Upgrades to the Utility Rack (UR) System at Gold Bar Waste Water Treatment Plant (GBWWTP). TIMELINE: The owner is currently seeking proposals from consultants for design and engineering services. The estimated contract period will be 21 month(s), with a proposed start date of 2023/02/15. Further update may be available in early 2023. *Budget is unreleased.

Conceptual

Water / Sewer

$200,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
32
Bidding Soon
502
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2023

Project location map

10977 50 St NW, Edmonton, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.