Published April 29, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Seymour, Connecticut. Completed plans call for the renovation of a municipal facility.

The project generally includes demolition of the existing diesel generator, elevated pad and fuel tank and provision of a new 500 kW generator with an integral 72-hour belly tank. The new generator will be mounted on an elevated concrete foundation with a raised platform, to locate it above the 100-year flood plain. The written request should be emailed to the following: Mr. Patrick Keough South Central Connecticut Regional Water Authority 90 Sargent Drive New Haven, CT 06511-5966 Phone: 203-401-2766 E-mail: PKeough@rwater.com The Bidders will meet at the Seymour Wellfield, 151 Roosevelt Street, Seymour, CT. For this Pre- Bid meeting, two forms of identification will be required for each person attending. All Bidders shall complete a Confidentiality Agreement prior to reviewing or purchasing Bid Documents and/or attending the Pre-Bid meeting.

Bid Results

Municipal

$667,475.00

Public - State/Provincial

Renovation

14

13

2

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Welded Wire Fabric Reinforcing
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Steep Slope Roofing, Shingles and Shakes, Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries
Division 27 - Communications

Division 27 - Communications

Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
498
Active Projects
245
Bidding Soon
4,937
All Active Projects
2,110
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2024

May 27, 2024

img_map_placeholder

151 Roosevelt Dr, Seymour, CT

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Generator Replacement at the Seymour Wellfield

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.