EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 20, 2023 at 7:00 PM

Updated October 1, 2024

Site work and paving for a bridge / tunnel in Wilmington, Illinois. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**As of January 20, 2022 , project was awarded to Riber Construction Inc. , awarded amount is $28,702.72.** This project generally includes upgrade and repair to the existing bridge #14's concrete box culvert structure located on the Wauponsee Glacial Trail in Wilmington, Illinois. For additional information and to download Bid Documents at portal. Participants must register in full to be eligible to receive addenda and to submit a bid. Bids shall be accompanied by the proper bid security. The Forest Preserve District of Will County reserves the right to accept any bid or any part or parts or combinations thereof, to waive any informalities or irregularities, and to reject any or all bids. For questions regarding the project, contact Operation’s Supervisor, Robert Zinkiewicz at bzinkiewicz@fpdwc.org or (815) 545-0743.

Award

Bridges / Tunnels

$28,703.00

Public - County

Paving, Site Work

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Subgrade Preparation, Compaction, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Slings

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
119
Bidding Soon
2,228
All Active Projects
947
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2022

January 18, 2023

img_map_placeholder

Wauponsee Glacial Trail, Wilmington, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bridge Improvements on the Wauponsee Glacial Trail

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.