BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2022 at 7:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Cullman, Alabama. Contact the soliciting agency for additional information.

The City of Cullman, Alabama 204 2nd Avenue NE (Physical Address) Cullman, AL 35055 P. O. Box 278 (Mailing Address) Cullman, AL 35056-0278 Engineer: St. John & Associates, Inc. 508 First Avenue SE Cullman, Alabama 35055 Date: December 3, 2022 The Project generally consists of the cleaning, CCTV pipeline inspection and data collection for approximately 150,000 linear feet of sanitary sewer collection system mainlines. Associated work includes root/blockage removal and other incidental items for complete point-to-point inspection of the collection system mainlines. Cleaning and inspection of select service lateral lines will also be required. The Owner requires the Project to be complete in 120 calendar days from the date that the Contract Times commence to run as indicated on the Notice to Proceed. In order to Bid on the Project, the Bidder shall possess a valid General Contractor's license for work in the State of Alabama. The Contractor's license number shall be clearly indicated on the outside of sealed Bid envelopes. Bidder and its Subcontractors shall comply with all applicable licensing requirements of the Code of Alabama, federal and local Laws or Regulations. A cashier's check or bid bond payable to the Owner in an amount not less than five (5) percent of the amount of the bid, not to exceed $10,000, must accompany the bidder's proposal. The Successful Bidder will be required to furnish the additional bond(s) and evidence of insurance as prescribed in the Bidding Documents. Bidders are directed to the Instructions to Bidders - Document 00 21 15 and the other Bidding Documents. Funding assistance for the Project is from the State Revolving Fund (SRF) Loan Program. Information on the applicable federal requirements is contained within the documents. Bid shall be submitted on the Bid Form provided. Bidders may supplement this form as appropriate. Bids will be required to be submitted under a condition of irrevocability for a period of 60 days from the date of the opening of Bids. The Owner reserves the right to accept or reject any or all Bids and to waive any informality in the bidding.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
94
Bidding Soon
803
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2023

February 3, 2023

Project location map

Multiple Locations, Cullman, AL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.