Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a medical facility in Maywood, Illinois. Completed plans call for the renovation of a medical facility.
John Madden MHC is establishing a one-time contract for the replacement of the boiler room condensate tank. Is this a Small Business Set Aside Procurement: Yes Is there a BEP/VBP Participation Goal : No FY23: Madden Mental Health Condensate Tank Replacement. Vendor to furnish all labor, materials, tools, and equipment needed to replace the condensation tank in the boiler room. Vendor is responsible for all removal and disposal of the old tank including all piping, motors, and concrete base. An asbestos abatement may be necessary around the piping insulation. A temporary tank must be provided while the new system is being installed. Successful vendor will include all costs associated with testing, material disposal, temporary tank, and installation of a new tank. A walk-through will be required. This contract is subject to the Prevailing wage Act.
Post-Bid
Medical
$600,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 10, 2023
March 13, 2023
1200 S 1st Ave, Maywood, IL
Related To This Project
Maywood, IL
Bid Date: Jun 22 2022
Maywood, IL
Bid Date: May 20 2021
Maywood, IL
Bid Date: Jun 29 2022
Maywood, IL
Bid Date: Jun 30 2022
Maywood, IL
Bid Date: Jul 01 2022
Maywood, IL
Bid Date: Aug 09 2022
Maywood, IL
Bid Date: Aug 12 2022
Maywood, IL
Bid Date: May 31 2022
Proviso School District 209 - Capital Improvements Phase 2 - Sequence 1 - BP 11D, 28A, 06K - 4740260
Maywood, IL
Bid Date: May 25 2022
Maywood, IL
Bid Date: Apr 12 2022
Maywood, IL
Bid Date: Nov 09 2020
Maywood, IL
Bid Date: May 12 2022
Maywood, IL
Bid Date: Apr 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.