BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a civil project in Aubrey, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Question Cuttoff Date & Time 2/29/2024 05:00:00 PM (CT) City reserves the right to waive irregularities and to accept or reject proposals. GENERAL DESCRIPTION OF WORK 11 The major work will consist of the following in general: 12 1. Replacement of electric motor operators on existing butterfly valves and the flow control 13 valve at the existing Raw Water Pump Station. 14 2. Replacement of electric motor operators on existing slide/sluice gates and drain valve 15 replacement at the existing two Pre-Ozone Contactors. 16 3. Replacement of basin drain plug valves, electric motor operators and telescoping valves, 17 electric motor operators and plug valves, and rehabilitation of the existing chain-and18 flight mechanisms at the existing two Flocculation/Sedimentation Basins. 19 4. Replacement of the electric motor operators and valves at the existing eight Biologically 20 Active Filters. 21 5. Replacement of the electric motor operator on the existing weir gate, replacement of the 22 electric motor operator and gate valve, and modification to the discharge header to 23 accommodate the new backwash storage tank at the existing Transfer Pump Station. 24 6. Construction of a new Variable Frequency Drive Building adjacent to the existing High 25 Service Pump Station to support the replacement of two existing 1000 HP soft starters 26 with 1000 HP Medium Voltage (4160 VAC) Adjustable Speed Drives and supporting 27 electrical improvements. 28 7. Replacement of the existing pumps, piping, and valves at the existing Washwater 29 Recover Basin. 30 8. Construction of a new ground storage tank, piping, valves, and programming to support 31 the conversion of the existing self-backwash Biologically Active Filter complex to a 32 ground storage tank support backwash system. 33 9. Replacement of the existing Chemical Containment Basin with a cast-in-place concrete 34 basin and pump station For questions regarding the 2nd Pre-Bid -Walk-Through only, please email: erica.garcia@cityofdenton.com or call 940-349-7131.

Post-Bid

Water / Sewer

$32,100,000.00

Public - City

Renovation, Site Work

345

55

5

2

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
75
Bidding Soon
3,518
All Active Projects
1,382
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.