Remodeling and renovation of a military facility in Boston, Massachusetts. Completed plans call for the remodel of a military facility.

QUESTIONS DUE: December 1, 2022 Supporting documentation along with a courtesy copy of the invoice shall also be e-mailed to the Contracting Officer and COR at the addresses cited below: Sr. Field Contracting Officer: Sean.E.Waldron@uscg.mil Contract Specialist: Nadine.M.Provost@uscg.mil COR: Owen.J.Bellamy@uscg.mil Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable.

Post-Bid

Military

$500,000.00

Public - Federal

Remodeling, Renovation

3

7

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
532
Active Projects
248
Bidding Soon
3,612
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2022

January 11, 2023

Project location map

427 Commercial Street, Boston, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.