BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2022 at 7:00 PM

Updated September 15, 2023

Renovation of a municipal facility in Boston, Massachusetts. Design plans call for the renovation of a municipal facility.

As of December 5, 2022, design is 27% complete. An engineer has been selected. A timeline for bid/ construction has not been determined. Construction is anticipated to last approximately 54 months. *The previous solicitation is listed below for reference. --- In this Request for Qualifications Statements/Proposals (“RFQ/P”) the Massachusetts Water Resources Authority (the “MWRA” or the “Authority”) requests qualifications statements and proposals (“Proposals”) from qualified firms (“Proposers”) interested in providing design and engineering services during construction for the construction of new 48-in and 60-in diameter pipelines and rehabilitation of existing pipelines to eliminate bottlenecks in the connections to pipeline Sections 53 and 99 in Malden and Revere, MA (the “Project”). A complete description of the services (“Scope of Services”) to be provided under this engagement is included as Attachment A to this RFQ/P. Proposers are advised that resident engineering and inspection services will be provided by others and are therefore not included in this Scope of Services. The MWRA anticipates that the successful Proposer will be awarded a contract which includes a modified cost plus fixed and percentage fee compensation methodology up to a not-to-exceed amount. The contract with the selected firm will be for a term of 102 months, with an effective start date planned for December 2019. This MWRA procurement will be an evaluative, one-step process. Proposers will submit information, to be evaluated by the Authority, concerning their cost, qualifications/key personnel, experience/past performance, technical approach, capacity/organization/management approach and MBE/WBE participation, as more fully described in Sections 4.3.1 through 4.3.5 of this RFQ/P. Enhancements and/or deletions to the Scope of Services will not be considered Estimated Construction Cost: $65,000,000 - $95,000,000. Deadline for questions is 8/19/19 @ 5:00 P.M. All questions shall be submitted in writing to PMA Consultants WestES@PMAConsultants.com referencing "West Elementary RFS Questions" in the subject line.

Design

Municipal

$95,000,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
532
Active Projects
249
Bidding Soon
4,055
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.