BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling and renovation of a military facility in Boston, Massachusetts. Completed plans call for the remodel of a military facility.

QUESTIONS DUE: December 1, 2022 Supporting documentation along with a courtesy copy of the invoice shall also be e-mailed to the Contracting Officer and COR at the addresses cited below: Sr. Field Contracting Officer: Sean.E.Waldron@uscg.mil Contract Specialist: Nadine.M.Provost@uscg.mil COR: Owen.J.Bellamy@uscg.mil Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. Perform chiller overhaul service and AdaptiView upgrades on Trane Centrifugal Chillers- Chiller 1 and Chiller 2, as specified in Attachment A, following this section. The work shall be phased to maintain operations at Base Boston to minimize system outages. The refrigerant shall be tested for contamination within 30 days of award. OPTIONAL BID ITEM #1(OBI #1): Recharge Chiller #1 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable. OPTIONAL BID ITEM #2(OBI #2): Recharge Chiller #2 with new refrigerant (R123) and Dispose of old refrigerant (R123), if existing refrigerant is found to be contaminated and unusable.

Post-Bid

Military

$500,000.00

Public - Federal

Remodeling, Renovation

3

7

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
350
Active Projects
223
Bidding Soon
2,700
All Active Projects
1,231
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2022

January 11, 2023

img_map_placeholder

427 Commercial Street, Boston, MA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.