BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and outdoor lighting for a playground / park / athletic field in Temecula, California. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

1. Locate all utilities prior to excavating - refer to General Supplementary Conditions. 2. Install underground electrical utilities and equipment for new field lighting standards. 3. Install new Owner-Furnished, Contractor-Installed field lighting standards. 4. Miscellaneous site work as shown in the Drawings. All bids shall be made and presented only on the forms presented by the District. Bids shall be received in the Office of the Facilities Department at TVUSD and shall be opened and publicly read aloud at the above state time and place. Any bids received after the time specified above or after any extensions due to material changes shall be returned unopened. Each request for clarification shall be submitted in writing, via email, to only the following persons: TO: April Kaufman, PBK Architects at april.kaufman@pbk.com CC: Jose Loza, TVUSD Coordinator of Construction & Development at jloza@tvusd.us Each transmitted request shall contain the name of the person and/or firm filing the request, address, telephone, and fax number, Specifications and/or Drawing number. Bidder is responsible for the legibility of hand written requests. Pre-bid clarification request shall be filed a minimum of six (6) days prior to bid opening (01/06/23). Requests received less than six (6) days before bid opening shall not be considered or responded to. A written response to timely pre-bid clarifications requests which materially affects the bidders price will be made by Addendum issued by the District not less than seventy-two (72) hours prior to bid opening. (01/11/23 at 2:00 pm) The Contract Time is 53 days. Project Timeline: 1/25/2023 - 03/08/2023 Solicitation No.: 220243, 04-121328, 219304, 463.038, 2022-23-13055

Award

Playgrounds / Parks / Athletic Fields

$339,379.00

Public - City

Outdoor Lighting, Site Work

15

15

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
100
Bidding Soon
2,138
All Active Projects
956
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2023

March 15, 2023

img_map_placeholder

27215 Nicolas Rd, Temecula, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.