Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 20, 2026 at 7:00 PM

Updated February 21, 2026

Site work for a water / sewer project in Vicksburg, Michigan. Completed plans call for site work for a water / sewer project.

Removal and replacement of the existing Sunset Lake Dam and spillway, which includes the following: cast-in-place labyrinth weir, pre-cast box culvert for Washington Ave, intermediate channel, secondary sheet pile weir, and limestone landscaping and retaining wall. The Project will also include removal and installation of outlet control structure for Prairie St Question Deadline 02/03/2026 at 5:00 PM ET All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing via email only to Rich Graham at richg@spicergroup.com.

Bid Results

Water / Sewer

$2,368,924.00

Public - County

Site Work

25

16

11

6

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
100
Bidding Soon
1,527
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

April 20, 2026

Project location map

W Washington St, Vicksburg, MI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed