BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and asbestos abatement for a residential development in Murphysboro, Illinois. Completed plans call for site work for a residential development; and for asbestos abatement for a residential development.

Work consists of the non-friable removal and disposal of asbestos containing floor tile and mastic from apartments and encapsulating the upper wood floors. All of the dwelling units scheduled for work will be vacated and available to allow for the execution of the work. The contractor shall perform the work in such a manner to protect existing finishes, equipment and adjacent work which is scheduled to remain. The contractor shall provide all labor, materials, equipment, and services and perform all work required for flooring tile abatement. These services will be required at various sites throughout all of Jackson County Housing's locations. The contractor must remove and abate asbestos containing materials including but not limited to 9x9 floor tiles, 12x12 floor tiles and asbestos containing mastics used in the installation of these tiles. Some sites may contain two layers of tiles. Very few sites consist of a base layer of tile covered by thin wood sheeting, with another layer of VCT tile on top. Any unit that is to be abated must have all materials removed down to the subflooring or concrete floor base. Sheet vinyl is also present at some units. Sheet vinyl will also be included in the abatement of a unit. When a unit is abated, cove base removal throughout the unit shall be included in the service. Contractor: 1. The contractor shall have a current license with the Illinois Department of Public Health Asbestos Abatement Contractor's License which shall remain in effect for the duration of the project. 2. The contractor shall provide all proper monitoring, testing, reports and disposal tickets for the Owner's records. 3. The contractor and its employees shall comply with all laws, rules and regulations governing the work, including but not limited to State of Illinois, Department of Public Health, State of Illinois EPA, Federal National Emissions Standards for Hazardous Air Pollutants and Occupational Safety and Health Administration, and any applicable local codes. Workers: 4. On site workers shall meet OSHA 1926.1101 work training requirements. 5. Certificates of compliance shall be submitted to the Owner's Representative prior to commencing work. 6. Abatement workers shall have a current Illinois Department of Public Health asbestos abatement workers' certificate. 7. Evidence of worker medical examinations must be submitted to the Owner's representative prior to commencing work. Bid Bond None Minority-Owned, Woman-Owned, and Small Business Enterprises are encouraged to respond to this solicitation.

Award

Residential Subdivision

$200,000.00

Public - County

Asbestos Abatement, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
43
Bidding Soon
736
All Active Projects
280
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2022

January 20, 2023

img_map_placeholder

Multiple Locations, Murphysboro, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.