Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Madison, Wisconsin. Completed plans call for the renovation of a municipal facility.
This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts 33 with the successful MEP bidders. PDF scanned file of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures (only PDF files will be accepted) emailed to doadfdmbidsubmission@wisconsin.gov (this is the preferred method); In general, the work consists of the replacement of existing boilers, pumps, and associated trim in the Greenhouse. Tie new boilers into the adjacent Horticultural Lab boiler system loop and abandon that existing boiler in place. Electrical work as required to support the mechanical work. Base Bids will be received as a single lump sum bid for: 4) Mechanical (Heating, Ventilating, Air Conditioning); and 5) Electrical. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Bid Result HVAC - Belonger Corporation, Inc - 196,000 Electrical - Forward Electric, Inc. - 37,621
Bid Results
Municipal
$233,621.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 17, 2023
February 16, 2023
To Be Determined, Madison, WI
Related To This Project
Madison, WI
--
Madison, WI
Bid Date: Jan 10 2023
Madison, WI
Bid Date: Jan 10 2023
Madison, WI
Bid Date: Jan 10 2023
Madison, WI
Bid Date: Jan 11 2023
Madison, WI
Bid Date: Dec 22 2022
Madison, WI
Bid Date: Dec 07 2022
Madison, WI
Bid Date: Mar 13 2018
Madison, WI
Bid Date: Jan 24 2023
Madison, WI
Bid Date: Mar 08 2023
Madison, WI
Bid Date: Dec 14 2023
Madison, WI
--
Madison, WI
Bid Date: Sep 21 2023
Madison, WI
Bid Date: May 22 2025
Madison, WI
Bid Date: Mar 21 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.