Demolition, site work and paving for a mixed-use development in Waukee, Iowa. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the demolition of a water / sewer project; and water / sewer project.

NORTHEAST OUTFALL SEWER Construct Northeast Outfall Sewer including all labor, materials and equipment necessary for approximately 18,600 linear feet 8-inch through 36-inch diameter sanitary sewer installed in open cut and trenchless construction, manholes, excavation and backfill, lift station demolition, removal and replacement of PCC trail, subdrain, surface restoration, and miscellaneous associated work, including cleanup. The Northeast Outfall Sewer will be located along Little Walnut Creek between approximately N Warrior Lane in Waukee and 144th Street in Urbandale. All work and materials are to be in accordance with the proposed plans, specifications, form of contract and estimate of cost now on file in the office of the City Clerk of Waukee, Iowa, and by this reference made a part thereof as though fully set out and incorporated herein. All proposals and bids in connection therewith shall be submitted to the City Clerk of said City on or before the time herein set for said receipt of bids. All proposals shall be made on official bidding blanks furnished by the City, and any alterations in the official form of proposal will entitle the Council, at its option, to reject the proposal involved from consideration. Each proposal shall be sealed and plainly identified. Each proposal shall be made out on a blank form furnished by the municipality and must be accompanied by bid security, as follows: a certified or cashier's check, drawn on a solvent Iowa bank or a bank chartered under the laws of the United States or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to ten percent (10%) of the bid, or a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa in a penal sum of ten percent (10%) of the bid. The bid security should be made payable to the CITY OF WAUKEE, IOWA. The bid security must not contain any conditions either in the body or as an endorsement thereon. The bid security shall be forfeited to the City as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within 10 days after the award of contract and post bond satisfactory to the City insuring the faithful fulfillment of the contract and the maintenance of said work, if required, pursuant to the provisions of this notice and the other contract documents. Bidders will use the bid bond form included in the specifications. Bidders will be required to comply with the President's Executive Order No. 11246. The requirements for bidders and contractors under this order are explained in the Federal grant documents. Bidders will be required to take affirmative steps to involve Disadvantaged Business Enterprise (DBE) in the work under the contract. Bidders shall complete the applicable certification attached to the proposal. The certification shall include a listing of DBEs, the work and estimated dollar amount to be performed by each such enterprise, and the percentage of the total bid to be used for disadvantaged business enterprise(s). The bidder commits itself to the goals for DBE participation contained herein and all other requirements, terms and conditions of these bid conditions when it submits a properly signed bid. Any bidder or equipment supplier whose firm or affiliate is listed in the GSA publication "List of Parties Excluded from Federal Procurement and Nonprocurement Programs" will be prohibited from the bidding process. Anyone submitting a bid who is listed in this publication will be determined to be a nonresponsive bidder in accordance with 40 CFR Part 31. A Contractor's Suspension/Debarment Certification will be contained in the specifications; however, this certification should not preclude any interested party from ascertaining whether the certifying person is actually on the "List of Parties Excluded from Federal Procurement and Nonprocurement Programs". Bidders will be required to follow prevailing wage rate requirements. The prevailing wage rates table will be contained in the specifications. In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed nonresponsive and rejected. The City reserves the right to defer acceptance of any proposal for a period not to exceed thirty (30) calendar days from the Deadline for submission of proposals. The successful bidder will be required to furnish bonds in an amount equal to one hundred percent (100%) of the contract price, said bonds to be issued by responsible surety approved by the City Council and listed in the U.S. Treasury Department's most current list (Circular 570, as amended) and authorized to transact business in the State of Iowa and shall guarantee (1) the faithful performance of the contract and the terms and conditions therein contained, (2) the prompt payment to all persons, firms, subcontractors and corporations furnishing materials, service, or transportation for or performing labor in the prosecution of the work, and (3) the maintenance of improvements in good repair for not less than four (4) years from the time of acceptance of the improvements by the City. The work will commence within ten (10) calendar days after the date set forth in written Notice to Proceed. The interim completion date with the sanitary sewer fully installed and tested and site restored with seeding in place between Sta. 72+80 and Sta. 105+00 is August 31, 2023. The interim completion date with the sanitary sewer fully installed and tested and site restored with seeding in place between Sta. 105+00 and Sta. 179+85 is February 29, 2024. The interim completion date with the sanitary sewer fully installed and tested and site restored with seeding in place between Sta. 1+00 and Sta. 185+49 is September 30, 2024. All work on the project shall be completed by May 20, 2025. The duration of the work is critical to the project so as to minimize the disruption associated with the project to the public. Damages in the amount of Five Hundred Dollars ($500.00) per calendar day will be assessed for each day that the sanitary sewer is not tested and televised and seeding is not placed between Sta. 72+80 and Sta. 105+00 after August 31, 2023 at the sole discretion of the City with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. Damages in the amount of Five Hundred Dollars ($500.00) per calendar day will be assessed for each day that the sanitary sewer is not tested and televised and that seeding is not placed between Sta. 105+00 and Sta. 179+85 after February 29, 2024 at the sole discretion of the City with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. Damages in the amount of Five Hundred Dollars ($500.00) per calendar day will be assessed for each day that the sanitary sewer is not tested and televised and seeding is not placed between Sta 1+00 and Sta 185+49 after September 30, 2024 at the sole discretion of the City with due allowance for extension of the contract period due to conditions beyond the control of the Contractor. Damages in the amount of Five Hundred Dollars ($500.00) per calendar day will be assessed for each day that the project is not completed after May 20, 2025 at the sole discretion of the City with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. Separate damage assessments may be made for each of the two completion dates. At the option of the City, damages may be deducted from any retainage prior to release, the final payment to contractor, or through the commencement of a cause of action by the City, in the City's sole discretion. The selection by the City of any particular course of action hereunder is not exclusive and shall not preclude the pursuit of additional remedies by the City. In the event the City institutes legal proceedings, the Contractor shall be responsible for any and all attorney's fees and expenses. Sales Tax Exemption. Contractors and subcontractors shall not include sales tax for material purchases. At the time of the contract acceptance by the City Council, the prime contractor and all subcontractors will be issued a certificate of exemption. Payment of the cost of said project will be made from any one or a combination of the following sources at the sole discretion of the City Council: (1) cash to be derived from the proceeds of the issuance and sale of Sewer Revenue Bonds, which will be payable solely and only out of the future net revenues of the Municipal Sewage Utility, and/or from such other cash funds on hand of said Utility as may be lawfully used for said purpose; (2) cash derived from the proceeds of the issuance and sale of General Obligation Bonds of said City; (3) cash from such general funds of said City as may be legally used for such purpose; and (4) cash from proceeds of a State Revolving Loan fund. Payment to the Contractor for said construction will be made from one or any combination of the following resources: (1) cash on hand as may be legally used for such purposes, (2) cash derived from the proceeds of the sale and issuance of General Obligation Bonds of the City, or any combination thereof. Payment to the Contractor will be on the basis of monthly estimates equivalent to ninety-five percent (95%) of the contract value of the work completed and payments made to material suppliers for materials ordered specifically for the project or delivered to the site during the preceding calendar month. Estimates will be prepared each month by the Contractor, subject to the approval of the Architect/Engineer, who will certify to the City for payment each approved estimate at least five days prior to City Council meeting. Such monthly payments shall in no way be construed as an act of acceptance for any part of the work partially or totally completed. Upon completion of the work and its acceptance by the City Council, the Contractor will be paid an amount which, together with previous payments, will equal ninety-five percent (95%) of the contract price of the contract. The balance due the Contractor will be paid, subject to the conditions and in accordance with the provisions of Chapters 26 and 573 of the Code of Iowa, as amended. No such partial or final payments will be due until the Contractor has certified to the City that the materials, labor and services involved in each estimate have been paid for in accordance with the requirements stated in the specifications. The City Council reserves the right to reject any or all bids, to waive informalities or technicalities in any bid and to accept the bid which it deems to be to the best interest of the City.

Award

Water / Sewer

$10,980,000.00

Public - City

Demolition, Paving, Site Work

74

11

4

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
50
Bidding Soon
913
All Active Projects
323
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 10, 2023

February 10, 2023

May 20, 2025

img_map_placeholder

N Warrior Ln, Waukee, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.