Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Lake View, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
2023 Lakeshore Drive Reconstruction The improvements will generally consist of the following: Special Compaction of Subgrade, 4.2 STA; Excavation, CL. 10 Roadway and Borrow, 115.0 CY; Topsoil, Furnish & Spread, 60 CY; Standard or Slip Form PCC, 7 In., 753 SY; Aprons, Metal, 12 In. Dia,, 1 EA; Manhole, Sanitary Sewer, SW-301,48 In., 1 EA; Intake, SW-511,1 EA; Sanitary Sewer Service Stub, PVC, 4 In., and 6 In., 27 LF; Revetment, Class D, 5 Ton; Removal of Pavement, 753 SY; Removal of Sidewalk, 10 SY; Sidewalk, PCC, 4 In. Thick, 10 SY; Detectable Warnings, 20 SF; Safety Closure, 2 EA; Traffic Control, 1 LS; Mobilization, 1 LS; Water Main, Trenched, PVC, 2 In., 218 LF; Water Service Stub, 1 In., 5 EA; Valve, Gate, DIP, 2 In., 1 EA; Mulching, 0.2 AC; Seeding and Fertilizing, 0.2 AC; and other items incidental thereto in accordance with the plans and specifications Each proposal shall be made on a form furnished by the City and must be accompanied by a cashier's or certified check drawn on a bank in Iowa or a bank chartered under the laws of the United States or a certified share draft on a credit union in Iowa or chartered under the laws of the United States or a bid bond executed by a corporation authorized to contract as a surety in Iowa and filed in an envelope separate from the one containing the proposal, sealed and in an amount equal to FIVE PERCENT (5%) of the amount of the proposal, made payable to the City Treasurer of the City of Lake View, Iowa, and may be cashed by the City as liquidated damages in the event the successful bidder fails to enter into a contract within 10 days of award and post bond satisfactory to the City insuring the faithful fulfillment of the contract as required by law and the specifications Payment to the contractor will be made in cash from funds on hand which may be legally used for such purposes including but not limited to all proceeds of governmental grants or loans as may be obtained. Payment will be made monthly by the City of Lake View based on estimates of ninety-five percent (95%) of the contract value of the work completed in an acceptable manner. The monthly progress payment will be made within thirty (30) days from the date the progress payment is approved by the City Council. Five percent (5%) of each project estimate will be retained and held as a suspended payment. Final payment will be made not less than thirty (30) days after completion of the work and acceptance by the City Council. Retention of unpaid funds and final payment shall be in accordance with Chapter 573, Code of Iowa, as amended The successful bidder will be required to furnish a bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City and shall guarantee the faithful performance of the contract and terms and conditions therein contained, shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor, and shall also guarantee the maintenance of all work and materials in good repair for not less than four (4) years from the time of acceptance of the improvements by the Owner. Plans and specifications governing the construction of the proposed improvements have been prepared by Sundquist Engineering, P.C., which plans and specifications and the proceedings referring to and defining said proposed improvements are hereby made a part of this Notice and the proposed contract by reference, and the proposed contract shall be executed in compliance therewith. The work on the proposed contract shall be commenced within 10 calendar days after written Notice to Proceed Is issued and shall be completed within 45 working days. There shall be no construction activity during the month of July 2023. The Contractor shall have the option of completing the work either in the Spring or Fall of 2023. For the Spring construction option, the late start date shall be March 20, 2023, with a completion date of May 27,2023. For the Fall construction option, the late start date shall be September 1,2023, and the work shall be completed within 45 working days. Liquidated damages in the amount of $350 per day shall be assessed the contractor for each calendar day that work proceeds on the project beyond the specified completion date, excepting authorized extensions thereof. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa, to materials supplied by companies from within the State of Iowa and to Iowa domestic labor. The City hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of sex, race, color or national origin in consideration for an award. The City reserves the right to reject any or all proposals and to waive informalities. Published upon order of the City Council of the City of Lake View, Iowa.
Award
Roads / Highways
$167,457.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 12, 2023
March 20, 2023
Lakeshore Dr, Lake View, IA
Related To This Project
Lake View, IA
Bid Date: Jan 10 2023
Lake View, IA
Bid Date: Jul 19 2022
Lake View, IA
Bid Date: Jun 01 2023
Lake View, IA
Bid Date: Nov 16 2021
Lake View, IA
Bid Date: Dec 09 2021
Lake View, IA
Bid Date: Dec 09 2021
Lake View, IA
Bid Date: Jan 17 2024
Lake View, IA
Bid Date: Feb 08 2024
Lake View, IA
Bid Date: Dec 12 2022
Lake View, IA
Bid Date: Oct 31 2022
Lake View, IA
Bid Date: Nov 15 2022
Waverly, IA
Bid Date: Dec 21 2022
Johnston, IA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.