Demolition, site work and new construction of an educational facility in Belchertown, Massachusetts. Working plans call for the demolition of a educational facility; for the construction of a 113,900-square-foot, three-story above grade educational facility; and for site work for a educational facility.
The new Jabish Brook Middle School building will be located at the same site as the existing middle school, 62 Washington Street. The new middle school building will be a three-story, 113,900 GSF facility with classrooms, a gymnasium, cafeteria/commons, athletic fields, and associated spaces. The existing middle school will remain open throughout construction. The existing school will be completely demolished after the new facility is occupied. The estimated construction cost for this project is $101.7 Million. This Request for Qualifications will be used to pre-qualify Construction Manager at Risk Firms. Firms interested in providing Public Construction Manager at Risk (CMR) Services for the Project are invited to submit a Statement of Qualifications ("SOQ") to Belchertown Public Schools. This CM at Risk services procurement is conducted pursuant to M.G.L. Chapter 149A, contained in Chapter 193 of the Acts of 2004. This Request for Qualifications ("RFQ") is the first phase of a two-phase procurement process as set forth in MGL Chapter 149A. The register of all respondents will be posted; however, responses will not be opened publicly. Belchertown Public Schools is prequalifying firms interested in providing public CMR services for the project through this RFQ process. Belchertown Public Schools will evaluate submitted SOQ's based upon the identified evaluation criteria and will select those respondents it deems qualified. Only those respondents deemed qualified will be invited to submit a Proposal in response to a detailed Request for Proposals ("RFP") which will be issued in the second phase of the procurement process. Only those firms determined to be qualified by the Prequalification Committee will be invited and permitted to submit a proposal in response to the Phase Two RFP. Firms that are not selected as qualified by the Prequalification Committee and firms that do not participate in the RFQ phase will be precluded from participating in the RFP CMR selection phase. The estimated project duration is 36 Months. The Designer assigned for this project is Lamoureux Pagano Associates Architects, and the Owner's Project Manager is Skanska USA Building. The Statement of Qualifications must be signed under pains and penalties of perjury. Design development documents will be available november 20, 2024 60% construction documents will be available march 5, 2025 early bid packages will be available (site only) march 19, 2025 90% construction documents will be available (early structural bid package available) june 18, 2025 100% construction documents will be available july 30, 2025 substantial comple- tion date for phase 1 (building) july 1, 2027 substantial comple- tion date for phase 2 (demolition remaining site work) august 1, 2028 Belchertown Public Schools reserves the right to waive any informality in, or to reject any or all responses, if in the public interest to do so.
Final Planning
Educational
$101,000,000.00
Public - City
Demolition, New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2024
February 24, 2025
62 N Washington St, Belchertown, MA
Related To This Project
Belchertown, MA
Bid Date: Apr 06 2022
Belchertown, MA
Bid Date: Apr 06 2022
Belchertown, MA
Bid Date: Jun 08 2022
Belchertown, MA
Bid Date: May 26 2022
Belchertown, MA
Bid Date: Aug 04 2022
Belchertown, MA
Bid Date: Jan 13 2022
Belchertown, MA
--
Belchertown, MA
--
Belchertown, MA
Bid Date: Nov 09 2022
Westfield, MA
Bid Date: Jan 05 2023
Brookline, MA
Bid Date: Apr 25 2024
Taunton, MA
Bid Date: Dec 22 2022
Pepperell, MA
Bid Date: Apr 10 2023
Bellingham, MA
Bid Date: Jan 05 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.