BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a fire / police facility in Potosi, Missouri. Working plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

The owner has selected a Construction Manager. A timeline for construction has not yet been established. Questions: Direct RFQ questions to Jeff Banderet, Great River Engineering, by email (preferred) at jbanderet@greatriv.com or by phone 314.400.7677. Request for Qualifications RFQ - Construction Manager Washington County Commission 102 North Missouri Street Potosi, MO 63664 Introduction: Washington County, Missouri is accepting Statements of Qualifications from interested and qualified construction managers to provide construction manager services, with guaranteed maximum pricing, for the construction of the project addressed here. The delivery method required is commonly known as construction manager at risk. During the preconstruction phase the construction manager will collaborate with the engineer, architect and owner on the design, constructability, cost and schedule of the projects, and develop a guaranteed maximum price proposal to complete the project. If the GMP proposal is approved, the construction manager will develop and maintain project schedules, develop bid packages, oversee construction, warrant the completeness of the project, and generally oversee the project to completion. The construction manager will be held responsible for providing preconstruction and construction services per the terms of the standard AIA Document A133TM - 2019 - Standard Form of Agreement Between Owner and Construction Manager as Constructor, where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price. Selection Process The owner will choose the firm that the owner believes to be in the best interest of Washington County, Missouri. The owner may choose to conduct interviews. The owner may reject any or even all proposals. The firm must hold all necessary licenses to perform construction management services in the state of Missouri. Proposals Should Include: 1. Full Legal Name and Contact Information for the Firm 2. A Description of the Firm Including Years of Experience, Number of Employees, Types of Projects Normally Undertaken, Special Skills or Unique Abilities for this project, and Any Awards Received 3. Evidence of Necessary License / Licenses to Perform Construction Management Work in Missouri 4. Evidence of Capacity to Add This Work to Current Work being Completed by the Firm 5. Evidence of Experience in Performing Work Similar to that Described in this Document for these Projects 6. Owner References 7. Evidence of Bonding Ability (Bid Bond State Law Requirements) 8. Description of Duties Performed in the Past on Similar Projects 9. Description of Proposed Staff and Plans to Team with the Owner and Architect During Design, Bidding, Construction, and Close Out. 10. Explanation of Proposed Fee Structure and Items of Costs that Are Included and Those Not Included. 11. Explanation of Reimbursables and Costs of Same Project Description The building is approximately 4,000 sf of new construction of a Sherriff Administration Building which is to include the demolition of the existing building, providing the necessary security measures for the adjacent jail building.The new building consist of wood framed stud walls with wood trusses. The site work consists of re-grading, improved parking area, concrete sidewalks and landscaping design.

Pre-Construction/Negotiated

Fire / Police

$700,000.00

Public - County

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
39
Bidding Soon
791
All Active Projects
302
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 27, 2022

April 27, 2023

img_map_placeholder

To Be Determined, Potosi, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.