BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Mineral Point, Missouri. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of August 13, 2024, per owner, Engineer and contractor have been identified. Project started construction July 29, 2024. Washington County, Missouri is requesting the services of a consulting engineering firm to provide professional engineering including preliminary engineering, grant applications, final design and construction inspection services for the Mineral Point Bridge Replacement project using a Delta Regional Authority Grant. The project is located in the Village of Mineral Point on North State Street over Mill Creek. It is envisioned this project will replace the crossing and immediate approach roadway with two 11-foot lanes of asphalt and a single span bridge/culvert structure. Please limit your response to a letter of interest no more than 3 total pages. This letter should include any information that may help us in the selection process, such as persons or team you would assign to this project, backgrounds of those individuals demonstrating familiarity with similar projects, and examples of projects that your company has recently completed. It is required that your firm's Statement of Qualifications (RSMo 8.285 through 8.291) shall be submitted with your firm's Letter of Interest or be on file with our County. Sincerely, Washington County Commission Please note the following scoring criteria will be used: Experience and Technical Competence 40 Max Points Capacity and Capability 30 Max Points Past Record of Performance 40 Max Points Note: A page is defined as 8-1/2 by 11 inches and printed on one side. 4 Copies of the letters of interest should be received at the address and time specified along with 1 Copy of the Statement of Qualifications. In addition, provide 1 jump drive with an electronic copy of both the letter of interest and statement of qualifica tions saved to it. The method of contractor selection has not been determined at this time.

Under Construction

Bridges / Tunnels

$900,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
37
Bidding Soon
763
All Active Projects
292
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2024

img_map_placeholder

S State St, Mineral Point, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.