BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a theater / auditorium in Gas City, Indiana. Completed plans call for the construction of a 45,150-square-foot theater / auditorium; and for site work for a theater / auditorium.

This new auditorium facility will consist of approximately 45,150 total square feet, including an approximately 7,000 square foot balcony, an approximate 34,500 square feet main level, a 650 SF Hallway, and an approximately 3,000 square feet of second floor space above the stage area. The main level, including the balcony, will include1,800 seat auditorium with a stage with back stage spaces including a Green Room with a restroom, Dressing Rooms with restrooms, a large loading dock with access to the stage, as well as a second-floor space. An entrance/lobby to the auditorium providing guests access to the ticket office, concessions, and restrooms will be included. The auditorium seating will be split and sloped towards the stage with most of the seating in the front two thirds; therefore, the entrances into the auditorium will be where the seating level splits. An exterior entrance will also provide access from grade level into the auditorium via a handicap ramp. Other support spaces on the main level not accessible to the public include a control room at the rear of the auditorium, several offices, first aid station, mechanical spaces, and custodial closets. An exterior recessed loading dock provides direct access to the stage. The exterior of the building will consist largely of pre-cast concrete panels with steel beams and bar joist flat roof. Storefront glass is used on the building's front facade with painted graphics on the precast panels. Construction is anticipated to begin on or before April 17, 2023 and be complete by July 18, 2024. All work for the complete construction of the Project shall be performed under separate prime contracts as follows: Construction Document Bid Set #2 include the following Bid Packages: Bid Package #3 Asphalt Paving Bid Package #4 Masonry Bid Package #5 Roofing Bid Package #6 General Construction Bid Package #7 Fire Sprinkler System Bid Package #8 Plumbing Bid Package #9 HVAC Bid Package #10 Electrical Bid Package #11 Fixed Seating Construction Document Bid Set #1 including the following Bid Packages has already bid and been awarded: Bid Package #1 Architectural & Structural Precast - Fabcon Precast, LLC Bid Package #2 Structural & Misc. Steel - Structural Steel Services, Inc. Construction Document Bid Set #1 Prime Contractors only are subject to compliance with the Davis Bacon Wage Rate requirements, and the established wage scale for these prime packages is included in the Project Manual specification section 001-012. Bids shall be submitted on a lump sum basis as indicated on the bid forms provided in the Project manual, and shall be executed in accordance with the Indiana Board of Accounts Form 96 (revised 2013) - "Contractor's Bid for Public Works", with a financial statement complying with Section III of Form 96, and a satisfactory Bid Bond or certified check pursuant to I.C. 36- 9-36-23, payable to The City of Gas City, Indiana. Bid Security shall be in the amount of not less than 5% of the total bid price. Should a successful Bidder withdraw their Bid or otherwise fail to execute a satisfactory Contract the Owner may then declare the Bid security forfeited as liquidated damages. The Prime Contractors receiving the award shall furnish an approved Performance and Payment Bond in the amount of 100% of the contract amount, which shall cover the faithful performance of the Contract and the payment of all obligations arising hereunder. Performance and Payment Bonds shall remain in full force and effect for one year from the date of acceptance of the Work. The Owner expects to award the Contract for the Work to the lowest, most responsible and responsive Bidder. The Owner reserves the right to accept or hold bids for up to 60 days from the date of the bid opening. The Owner reserves the right to reject any bid, and to waive irregularities in the Bidding. Questions pertaining to this Project should be submitted in writing (via email) to Chirag Patel (chiragp@brandtconstruction.com) and Mike Ralstin (miker@brandtconstruction.com) no later than (7) calendar days prior to date set for receipt of Bids. The City of Gas City, Indiana, prohibits discrimination and/or the exclusion of individuals from its municipal facilities, programs, activities, and services based on the individual person's race, color, national origin, sex, age, disability, low-income status, sexual orientation, or limited English proficiency. The City of Gas City, Indiana, affirms its commitment to providing meaningful opportunities and access to municipal facilities, programs, activities, and services in an effort to comply with all laws including: Title VI of the Civil Rights Act of 1964, as amended; Section 504 of the Rehabilitation Act of 1973, as amended; and the Americans with Disabilities Act of 1990, as amended. Prospective Bidders may obtain Bidding Documents from Eastern Engineering, Fishers, IN by any of the following methods: Downloading a complete set of Bidding Documents. Purchase printed copies of bidding documents.

Post-Bid

Theaters / Auditoriums

$15,000,000.00

Public - City

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
116
Bidding Soon
1,246
All Active Projects
526
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 15, 2022

April 17, 2023

img_map_placeholder

To Be Determined, Gas City, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.