BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2023 at 7:00 PM

Updated January 25, 2024

Site work for a power facility in Lubbock, Texas. Completed plans call for site work for a power facility.

Lubbock Power and Light McDonald Feeder Line Construction Services Award to be made on an all or none basis and will not be awarded to separate offerors. Expected award date is January 17, 2023. The successful Offeror will be required to furnish a performance bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $100,000 and the successful Offeror will be required to furnish a payment bond in accordance with Chapter 2253, Government Code, in the amount of 100% of the total contract price in the event that said contract price exceeds $50,000. Said statutory bonds should be issued by a company carrying a current Best Rating of "A" or better. Offerors are required, whether or not a payment or performance bond is required, to submit a cashier's or certified check issued by a bank satisfactory to the Lubbock Power & Light, or a proposal bond from a reliable surety company, payable without recourse to the order of Lubbock Power & Light in an amount not less than 5% of the total amount of the proposal submitted as a guarantee that Offeror will enter into a contract and execute all necessary bonds (if required) within ten (10) business days after notice of award of the contract to him. If Providing a 5% Proposal Surety Bond, the Bond Must Have an Original Raised Seal or Raised Stamp. the Bond Must Be Accompanied by a Valid Power of Attorney. Failure to Provide the Original Proposal Bond as Described Herein, or the Valid Power of Attorney With the Proposal Submittal Shall Constitute a Non-responsive Proposal and Result in Disqualification of the Proposal Submittal. A Copy of the Bid Bond Will Not Be Accepted. Attention of each Offeror is particularly called to the schedule of general prevailing rate of per diem wages included in the contract documents on file in the office of the Purchasing Manager Electric Utilities of Lubbock Power & Light, which document is specifically referred to in this notice to offerors. Each offerors attention is further directed to Texas Government Code, Chapter 2258, Prevailing Wage Rates, and the requirements contained therein concerning the above wage scale and payment by the contractor of the prevailing rates of wages as heretofore established by owner in said wage scale.

Award

Power Plant

$878,590.00

Public - City

Site Work

10

18

3

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
5
Bidding Soon
253
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 28, 2022

February 7, 2023

Project location map

1314 Avenue K, Lubbock, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.