BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 22, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Hartford, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

20230711003 1330-22-70 Grading, Base, Milling, Asphalt Pavement, Curb and Gutter, Sidewalk, Guardrail, Signs, Pavement Markings, Box Culvert Construction, Retaining Wal Work Type: AD DBE Goal: 0% Completion Date Contract: June 28, 2024 With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, banks check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. WI DOT - 003 - STH 83 - Hartford to Chenequa The work under this contract shall consist of removing structure R-66-0080, removing 2-72"x48" corrugated steel pipe arch culverts, removing concrete block endwalls, removing traffic flashing beacons, removing concrete pavement, removing asphaltic surface milling, removing curb & gutter and concrete sidewalk, removing guardrail, excavation common/marsh, excavation for culverts, excavation for retaining walls, maintaining temporary drainage, backfill structure, base aggregate, base patching, asphaltic repair, HMA pavement, wall modular block gravity R-66-0086, concrete box culvert B-66-146, concrete masonry endwalls, bar steel, curb ramps, manhole & inlet reconstruction/adjustments, MGS guardrail, erosion control, restoration, signing, traffic control, marking, traffic flashing beacons, sawing and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. 104-005 (20090901)

Award

Roads / Highways

$3,257,794.00

Public - State/Provincial

Paving, Site Work

298

5

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
295
Active Projects
165
Bidding Soon
1,663
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2023

August 10, 2023

Project location map

WI-83, Hartford, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.